5312 Freestone Cir
Dallas, TX 75227
New driveway approach and sidewalk permitted in Dallas
A 10-foot-wide driveway approach and sidewalk for a single-car driveway are planned at 5312 Freestone Cir. The City of Dallas permit was filed on September 9, 2026 (RES-DSW-26-000423).
Summarized from City of Dallas records · updated Sep 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2026
- since Sep 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project10’ft wide approach and sidewalk for new single car driveway that is 32’ft length in front of home with 4” concrete & #3 rebar @12” o.c each way with 3500 psi concrete broom finish
10’ft wide approach and sidewalk for new single car driveway that is 32’ft length in front of home with 4” concrete & #3 rebar @12” o.c each way with 3500 psi concrete broom finish
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 5312 Freestone Cir
What is being built at 5312 Freestone Cir?
A City of Dallas permit covers a 10-foot-wide driveway approach and sidewalk for a new single-car driveway. It specifies a 32-foot driveway length.
When was the driveway permit filed?
The permit was filed on September 9, 2026. Its number is RES-DSW-26-000423.
What does permit RES-DSW-26-000423 cover?
It covers a residential driveway approach and sidewalk at 5312 Freestone Cir, with 4-inch concrete and a broom finish specified in the record.
Is a new home being built at 5312 Freestone Cir?
The available City of Dallas record is for a driveway approach and sidewalk permit; it does not list a home construction project.
What construction is listed near Dfwss02 Spice & Bean Remodel?
At 5312 Freestone Cir, about 129 meters from the listed remodel at 7700 Samuell Blvd, a permit covers a new single-car driveway approach and sidewalk. The records describe separate addresses.
What work is listed near Fifth Third Bank on Samuell Boulevard?
A City of Dallas permit at 5312 Freestone Cir covers a residential driveway approach and sidewalk. The address is about 198 meters from the listed Fifth Third Bank project at 7650 Samuell Blvd.
Also being built nearby
All of 75227- 7195 Elliott DrSep 1, 2026Replacing gas line in backyard approximately 60ft · 27 m away
- 7184 Elliott DrDec 18, 2025Install 50 gallon electric water heater in garage (swap out) · 59 m away
- 7700 Samuell Blvd · H-E-B Grocery Company, LPAug 13, 2026Remodel produce cases · 129 m away
- 7163 Vinland StJun 18, 2025Install 40 gallon gas water heater in garage closet (swap out) · 170 m away
- 7159 Vinland StAug 4, 2025Composite re-roof & re-deck · 176 m away
- 7160 Vinland StJun 3, 2026Replace water heater · 184 m away
- 7151 Vinland StMay 8, 2026Gas test · 190 m away
- 7153 Rolling Fork DrOct 7, 2025Install (1) 50 gal gas water heater in garage closet (change out) · 197 m away
- 7650 Samuell Blvd · H-E-B, LPOct 22, 2026Construction of a new single-story, freestanding fifth third bank with a structural steel frame measuring 49'-10" × 62'-6". the development includes drive-through banking services and an enclosed trash facility. exterior materials - including slate gray brick, dover sky stucco, metal panels, and matching coping · 198 m away
- 7148 Vinland StNov 5, 2025Panel replacement · 204 m away
- 7165 Teresita TrlJun 26, 2025Repair leak in 1 1/2 in plastic water service · 238 m away
- 5165 S Buckner BlvdNov 12, 2026Install all new plumbing · 273 m away