7700 Samuell Blvd
Dallas, TX 75227 · H-E-B Grocery Company, LP
Refrigerated produce cases being remodeled at 7700 Samuell Blvd
A 276-square-foot interior remodel at 7700 Samuell Blvd includes replacing refrigerated cases and relocating display bins; the existing building footprint will remain unchanged. The TDLR project registration was filed February 27, 2026, and Dallas permits filed in August cover electrical, mechanical and plumbing work on the produce cases.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 13, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Aug 13, 2026
- since Jun 4, 2025
- Largest scope
- 276 sf
- Estimated cost
- $55K
- state registration
Where this project stands
Inspected · closing outDFWSS02 Spice & Bean Remodel
276 sq ft · $55K est.
- RegisteredFeb 27, 2026
- Plan review
- ConstructionJun '26 – Aug '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
6 projectsDemolition two cases and install two new produce cases. run a new line set system ra46 for produce
Demolition two cases and install two new produce cases. run a new line set system ra46 for produce
City of Dallas permitCommercial Mechanical PermitMcr this 276 sq ft project involves removing 16 lf of wall cases, installing new refrigerated cases, and relocating display bins, with no change to the existing building footprint
Mcr this 276 sq ft project involves removing 16 lf of wall cases, installing new refrigerated cases, and relocating display bins, with no change to the existing building footprint
City of Dallas permitCommercial Alteration Addition Permit276 sq ft at dfwss 02 comprises of remodel of 16 linear feet of wall cases and installing new refrigerated cases and relocating display bins. the existing building foot print will remain unchanged. — heb corp#805
TDLR project registrationRenovation/AlterationInspection Complete276 sq ft$55K est.- Project #
- TABS2026013797
- Tenant / owner
- Dfwss02 Spice & Bean Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 7700 Samuell Blvd
What is being built at 7700 Samuell Blvd in Dallas?
Permit records indicate an interior remodel involving refrigerated produce cases and display bins, not a new building. The project covers 276 square feet, with no change to the existing building footprint.
What is the remodel at 7700 Samuell Blvd changing?
The project description calls for removing and replacing wall and refrigerated cases and relocating display bins. Dallas permits filed in August 2026 also cover produce-case electrical and mechanical work and a hub drain.
When was the 7700 Samuell Blvd project permitted?
The TDLR project registration, TABS2026013797, was filed February 27, 2026. Dallas permits for the remodel were filed June 8 and August 2, 7 and 13, 2026.
How much will the 7700 Samuell Blvd remodel cost?
The TDLR registration lists an estimated project cost of $54,668. This is the applicant's estimate, not a confirmed final cost.
What's being remodeled near Fifth Third Bank on Samuell Boulevard?
At 7700 Samuell Blvd, records indicate a 276-square-foot remodel of refrigerated produce cases and display bins. The address is about 108 meters from the Fifth Third Bank listing at 7650 Samuell Blvd.
Is a new building going up at 7700 Samuell Blvd?
The records describe interior case and display-bin work, and say the existing building footprint will remain unchanged. They do not indicate construction of a new building.
Also being built nearby
All of 75227- 7650 Samuell Blvd · H-E-B, LPOct 22, 2026Construction of a new single-story, freestanding fifth third bank with a structural steel frame measuring 49'-10" × 62'-6". the development includes drive-through banking services and an enclosed trash facility. exterior materials - including slate gray brick, dover sky stucco, metal panels, and matching coping · 108 m away
- 5312 Freestone CirSep 9, 202610’ft wide approach and sidewalk for new single car driveway that is 32’ft length in front of home with 4” concrete & #3 rebar @12” o.c each way with 3500 psi concrete broom finish · 129 m away
- 7195 Elliott DrSep 1, 2026Replacing gas line in backyard approximately 60ft · 153 m away
- 7184 Elliott DrDec 18, 2025Install 50 gallon electric water heater in garage (swap out) · 183 m away
- 7163 Vinland StJun 18, 2025Install 40 gallon gas water heater in garage closet (swap out) · 290 m away
- 7159 Vinland StAug 4, 2025Composite re-roof & re-deck · 298 m away
- 7153 Rolling Fork DrOct 7, 2025Install (1) 50 gal gas water heater in garage closet (change out) · 300 m away
- 7160 Vinland StJun 3, 2026Replace water heater · 304 m away
- 7165 Teresita TrlJun 26, 2025Repair leak in 1 1/2 in plastic water service · 307 m away
- 5165 S Buckner BlvdNov 12, 2026Install all new plumbing · 313 m away
- 7151 Vinland StMay 8, 2026Gas test · 315 m away
- 7148 Vinland StNov 5, 2025Panel replacement · 329 m away
More demolitions in 75227.