7777 Forney Rd
Dallas, TX 75227
Skyline High School additions and campus renovations
Permits filed July 7, 2026, describe athletic and performing arts additions at Skyline High School, along with renovations to the choir and band hall. The plans also include campus site work, a new pickup lane, a locker room, and a secure entry. Separate mechanical, plumbing, and electrical permits were filed from August through October 2026.
Summarized from City of Dallas records · updated Oct 20, 2026
- Projects
- 18
- 18 filings
- Latest filing
- Oct 20, 2026
- since May 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
18 projectsDemolition of lightinginstallation of new lighting demolition and make safe of powerinstallation of new outlets
Demolition of lightinginstallation of new lighting demolition and make safe of powerinstallation of new outlets
City of Dallas permitCommercial Electrical PermitSee phases dsst-disd skyline high school project includes an athletic and a performing arts addition. both buildings are storm shelters. renovation of existing choir and band hall. installation of new tile in the main corridors of the campus. addition of new pick up lane and replacing fire lane
See phases dsst-disd skyline high school project includes an athletic and a performing arts addition. both buildings are storm shelters. renovation of existing choir and band hall. installation of new tile in the main corridors of the campus. addition of new pick up lane and replacing fire lane
City of Dallas permitCommercial Alteration Addition PermitDsst-disd skyline hs site worknew fire lane, sidewalks, street lights, drop off lane and landscaping
Dsst-disd skyline hs site worknew fire lane, sidewalks, street lights, drop off lane and landscaping
City of Dallas permitPhase - Alteration Addition
Sources: City of Dallas
Questions about 7777 Forney Rd
What is being built at 7777 Forney Road in Dallas?
City of Dallas permits describe athletic and performing arts additions at Skyline High School, as well as campus renovations and site work. The main alteration and addition permit, COM-ALT-ADD-25-001379, was filed July 7, 2026.
What additions are planned at Skyline High School?
The July 7, 2026, permits describe athletic and performing arts additions. The permit records say both buildings are storm shelters.
What other work is included in the Skyline High School project?
The permit description includes renovation of the existing choir and band hall, new tile in main corridors, a new pickup lane, and a replacement fire lane. Separate phase permits also list a locker room, secure entry, and site work.
When were permits filed for work at 7777 Forney Road?
The records span May 21, 2025, through October 20, 2026. Permits for the listed school additions and campus work were filed July 7, 2026.
What are the latest permits for Skyline High School?
A commercial mechanical permit described as “Skyline” was filed October 20, 2026 (COM-MEC-26-002698). Other recent records include a plumbing permit filed September 25 and an electrical permit filed September 15, 2026.
Do the permits include electrical or HVAC work?
Yes. An electrical permit filed September 15, 2026 (COM-ELC-26-004591), describes removing and installing lighting and outlets, plus making power safe. Mechanical permits were filed August 5 and October 20, 2026.
Also being built nearby
All of 75227- 7777 Forney Road · Dallas Independent School DistrictJan 15, 2026Skyline hs athletics & reno project — renovation/alteration — addition of two buildings with a total of approximately 50,000 sq ft with various site improvements and interior renovations
- 4700 Wimbelton WaySep 2, 2026Installing all plumbing damaged by fire · 49 m away
- 7602 Forney RdAug 12, 2026Gas repair/test · 102 m away
- 7814 Forney RdNov 18, 2020Gas relay or repair with test · 187 m away
- 7922 Forney RdJan 5, 2021Electrical repairs · 283 m away
- 4334 Scottsdale DrJan 14, 2021Remove existing roof and install new roof · 319 m away
- 8006 Forney RdApr 29, 2026Electrical service · 358 m away
- 4320 Mcneil StAug 5, 2025Gas repair inside houseby water heater · 405 m away
- 7974 Chariot DrFeb 2, 2026Building 1 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 8039 chariot dr building 7974 dallas, tx 75227 · 438 m away
- 7980 Chariot DrFeb 2, 2026Building 2 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 2 of 23 and new address is 8039 chariot dr building 7980 dallas, tx 75227 · 439 m away
- 7986 Chariot DrFeb 2, 2026Building 3 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 3 of 23 and new address is 8039 chariot dr building 7986 dallas, tx 75227 · 440 m away
- 8008 Chariot DrFeb 2, 2026Building 4 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 4 of 23 and new address is 8039 chariot dr building 8008 dallas, tx 75227 · 452 m away
More demolitions in 75227, gyms & fitness in 75227, offices in 75227.