Skyline High School to add two buildings totaling about 50,000 sq. ft.
A project at Skyline High School calls for two new buildings totaling approximately 50,000 square feet, along with site improvements and interior renovations. The Texas Department of Licensing and Regulation registered the project on January 15, 2026. The applicant's estimated project cost is $40.2 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 15, 2026
- since Jan 15, 2026
- Largest scope
- 50,000 sf
- Estimated cost
- $40M
- state registration
Where this project stands
In state plan reviewSkyline HS Athletics & Reno Project
50,000 sq ft · $40M est.
- RegisteredJan 15, 2026
- Plan reviewnow
- ConstructionMar '26 – Dec '28
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAddition of two buildings with a total of approximately 50,000 sq ft with various site improvements and interior renovations. — skyline high school
TDLR project registrationRenovation/AlterationProject Registered50,000 sq ft$40M est.- Project #
- TABS2026010123
- Tenant / owner
- Skyline Hs Athletics & Reno Project
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7777 Forney Road
What is being built at 7777 Forney Road in Dallas?
The project calls for two buildings at Skyline High School, totaling approximately 50,000 square feet, along with site improvements and interior renovations.
Is Skyline High School getting new buildings?
Yes. A TDLR project registration dated January 15, 2026, describes the addition of two buildings totaling about 50,000 square feet.
How much space will the Skyline High School project add?
The project description gives a total of approximately 50,000 square feet for the two buildings.
When was the Skyline High School project registered?
The Texas Department of Licensing and Regulation registered the project on January 15, 2026.
How much will the Skyline High School project cost?
The applicant's estimated cost for the project is $40.2 million.
What renovations are planned at Skyline High School?
The project description includes interior renovations and various site improvements, in addition to two new buildings.
What is the TDLR number for the Skyline High School project?
The TDLR project registration number is TABS2026010123.
Also being built nearby
All of 75227- 7777 Forney RdOct 20, 2026Skyline
- 4700 Wimbelton WaySep 2, 2026Installing all plumbing damaged by fire · 49 m away
- 7602 Forney RdAug 12, 2026Gas repair/test · 102 m away
- 7814 Forney RdNov 18, 2020Gas relay or repair with test · 187 m away
- 7922 Forney RdJan 5, 2021Electrical repairs · 283 m away
- 4334 Scottsdale DrJan 14, 2021Remove existing roof and install new roof · 319 m away
- 8006 Forney RdApr 29, 2026Electrical service · 358 m away
- 4320 Mcneil StAug 5, 2025Gas repair inside houseby water heater · 405 m away
- 7974 Chariot DrFeb 2, 2026Building 1 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 1 of 23 and new address is 8039 chariot dr building 7974 dallas, tx 75227 · 438 m away
- 7980 Chariot DrFeb 2, 2026Building 2 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 2 of 23 and new address is 8039 chariot dr building 7980 dallas, tx 75227 · 439 m away
- 7986 Chariot DrFeb 2, 2026Building 3 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 3 of 23 and new address is 8039 chariot dr building 7986 dallas, tx 75227 · 440 m away
- 8008 Chariot DrFeb 2, 2026Building 4 of 23 we are installing a 600a utility transocket. 1. existing overhead utility service conductors are landed into an existing 600a main breaker disconnect. 2. we are removing the existing conductors and landing them into the line side of new utilty transocket 6 inches away. 3. we will then run conductors from the load side of the new utility transocket back to the 600a main breaker disconnect. we have 23 buildings at this property and will file a permit for each building as oncor has created a new main electric meter address for each building. this is application for building 4 of 23 and new address is 8039 chariot dr building 8008 dallas, tx 75227 · 452 m away