10341 Plummer Dr
Dallas, TX 75228
10341 Plummer Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 10341 Plummer Dr, Dallas, TX 75228. The most recent, filed January 28, 2021, covers: “Gas test”.
Compiled from City of Dallas records · updated Jan 28, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2021
- since Jan 28, 2021
- Largest scope
- —
- Listed value
- $5
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 10341 Plummer Dr
What is being built at 10341 Plummer Dr?
The latest filing (City of Dallas permit 2101283007, January 28, 2021) covers gas test.
How many permits and filings does 10341 Plummer Dr have?
1 filing across 1 project, from January 28, 2021 to January 28, 2021.
How much is the construction at 10341 Plummer Dr worth?
Permits at this address list about $5 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 10341 Plummer Dr?
Yes. Nearby filings include 10331 Plummer Dr (under home rough in, Jul 14, 2026); 10354 Plummer Dr (replace riser on gas line, Oct 30, 2026); 11005 Milhof Dr (new sewer line yard servicenew water rough for bar water and draian, Jul 21, 2025).
How do I get alerts for new permits at 10341 Plummer Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 10331 Plummer DrJul 14, 2026Under home rough in · 45 m away
- 10354 Plummer DrOct 30, 2026Replace riser on gas line · 48 m away
- 11005 Milhof DrJul 21, 2025New sewer line yard servicenew water rough for bar water and draian · 73 m away
- 11011 Milhof DrMay 12, 2025New sewer, water, in master bath, cap off gas line, install new water heater, move gas line. set fixtures · 98 m away
- 10322 Sandra Lynn DrJun 17, 2025Replace driveway approach and city walk · 103 m away
- 10309 Plummer DrJun 10, 2026I will be taking down about 170 ft of fence around my property and replacing the existing fence line with a new 8 ft cedar fence. the fence design and size meet city guidelines. the job will take 3-4 days to complete · 128 m away
- 3512 Mayhew DrOct 7, 2025Sewer under pier and beam replacement · 135 m away
- 10311 Sandra Lynn DrJan 2, 2026Upgrade electrical service ,installation of new meter base ,new 200 amp electrical panel only, existing panel is inside the closet, now to be relocated at the exterior wall · 142 m away
- 3507 Mayhew DrAug 18, 2026Gas test, bring appliances up to code · 145 m away
- 3527 Mayhew DrJan 11, 2021Install water heater · 158 m away
- 11010 Milhof DrDec 10, 2025Meter repair · 159 m away
- 10379 Plummer DrNov 4, 2026Gas repair at meter in alley · 164 m away