11011 Milhof Dr
Dallas, TX 75228
11011 Milhof Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 11011 Milhof Dr, Dallas, TX 75228 since May 7, 2025. The most recent, filed May 12, 2025, covers: “New sewer, water, in master bath, cap off gas line, install new water heater, move gas line. set fixtures”.
Compiled from City of Dallas records · updated May 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 12, 2025
- since May 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNew sewer, water, in master bath, cap off gas line, install new water heater, move gas line. set fixtures
New sewer, water, in master bath, cap off gas line, install new water heater, move gas line. set fixtures
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 11011 Milhof Dr
What is being built at 11011 Milhof Dr?
The latest filing (City of Dallas permit RES-PLM-25-000110, May 12, 2025) covers new sewer, water, in master bath, cap off gas line, install new water heater, move gas line. set fixtures.
How many permits and filings does 11011 Milhof Dr have?
2 filings across 2 projects, from May 7, 2025 to May 12, 2025.
Is there other construction near 11011 Milhof Dr?
Yes. Nearby filings include 11005 Milhof Dr (new sewer line yard servicenew water rough for bar water and draian, Jul 21, 2025); 10354 Plummer Dr (replace riser on gas line, Oct 30, 2026); 11010 Milhof Dr (meter repair, Dec 10, 2025).
How do I get alerts for new permits at 11011 Milhof Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 11005 Milhof DrJul 21, 2025New sewer line yard servicenew water rough for bar water and draian · 26 m away
- 10354 Plummer DrOct 30, 2026Replace riser on gas line · 56 m away
- 11010 Milhof DrDec 10, 2025Meter repair · 66 m away
- 10341 Plummer DrJan 28, 2021Gas test · 98 m away
- 10331 Plummer DrJul 14, 2026Under home rough in · 102 m away
- 3512 Mayhew DrOct 7, 2025Sewer under pier and beam replacement · 105 m away
- 3527 Mayhew DrJan 11, 2021Install water heater · 106 m away
- 11039 Milhof DrAug 21, 2026Gas test with repairs · 116 m away
- 3507 Mayhew DrAug 18, 2026Gas test, bring appliances up to code · 122 m away
- 11046 Milhof DrOct 23, 2025Replacing sewer and water lines under pier and beam home. installing new double cos and valve box for water near home perimeter · 139 m away
- 10379 Plummer DrNov 4, 2026Gas repair at meter in alley · 155 m away
- 10309 Plummer DrJun 10, 2026I will be taking down about 170 ft of fence around my property and replacing the existing fence line with a new 8 ft cedar fence. the fence design and size meet city guidelines. the job will take 3-4 days to complete · 177 m away