12600 International Pkwy
Dallas, TX 75228
Electrical inspection and gas-test permits at 12600 International Pkwy
Permits at 12600 International Pkwy indicate electrical inspection work for a building material distributor and a gas test. The electrical permit was filed June 13, 2025, and the gas-test permit was filed November 13, 2025.
Summarized from City of Dallas records · updated Nov 13, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 13, 2025
- since Jun 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 12600 International Pkwy
What is being built at 12600 International Pkwy in Dallas?
The records do not describe a new building. They show an electrical permit for inspection work at a building material distributor and a separate gas-test permit.
What work was permitted at 12600 International Pkwy?
A commercial electrical permit describes an inspection for electricity at a building material distributor. A later commercial plumbing permit is for a gas test.
When were permits filed for 12600 International Pkwy?
The electrical permit, COM-ELC-25-000464, was filed June 13, 2025. The gas-test permit, COM-PLM-25-002617, was filed November 13, 2025.
Is a building material distributor opening at 12600 International Pkwy?
The June 13, 2025, electrical permit describes the location as a building material distributor. The record does not say whether a business is opening.
Is there a gas line project at 12600 International Pkwy?
A City of Dallas commercial plumbing permit filed November 13, 2025, describes a gas test. The record does not provide additional details about the work.
Also being built nearby
All of 75228- 12626 International PkwyJan 11, 2026Gas test · 17 m away
- 12623 International PkwyOct 19, 2020Replace or modify existing hvac · 19 m away
- 12656 International PkwyJan 11, 2026Gas line test · 36 m away
- 12010 Corporate DrJan 5, 2021Remove 59 ast in the interior and exterior from the site. no build back of tanks · 155 m away
- 12623 International DrMar 2, 2026Zo bu no work has been performed. we bought the building as is and signed a new lease on at the property. our tenant applied for c of o but we were told the current floor plan does not match the existing floor plan the city has on record. at one point the building was two suites but it is currently one suite. when we bought the building it only had 1 set of utility meters for each utility · 159 m away
- 12020 Corporate DrDec 18, 2020Gas test · 169 m away
- 3001 Weather Vane LnAug 21, 2026Replace 3 ton complete heat pump system · 184 m away
- 12790 International PkwyFeb 6, 2026Gas tests/ minor gas repairs - 2 seperate addresses to test - first has co - 2nd address co is pending work on access road of 635 · 263 m away
- 3121 Santa Anna AveMay 8, 2026Replace hvac system with 3 ton goodman deluxe vertical heat pump; no duct work · 270 m away
- 3105 Santa Anna AveSep 10, 2026Water relay · 271 m away
- 12097 Corporate DrJul 22, 20261) install new concrete pad for oncor transformer.2) install all service conduit & wiring from transformer pad to building disconnect · 277 m away
- 12102 Corporate DrDec 5, 2025Perform a full gas pressure test to identify and locate any gas leaks. meter is currently locked and will require release through the proper permitting process prior to restoring service · 285 m away