Gas test permit filed at 12626 International Pkwy
A commercial plumbing permit for a gas test was filed at 12626 International Pkwy on January 11, 2026. The record does not describe new building construction or identify a tenant.
Summarized from City of Dallas records · updated Jan 11, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 11, 2026
- since Jan 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 12626 International Pkwy
What is being built at 12626 International Pkwy?
The City of Dallas record is for a gas test, not a described building project. The commercial plumbing permit, COM-PLM-26-000066, was filed January 11, 2026.
What does the permit at 12626 International Pkwy cover?
It covers a gas test under a commercial plumbing permit. The record does not provide further details about the work.
When was the gas test permit filed at 12626 International Pkwy?
The permit was filed January 11, 2026. Its number is COM-PLM-26-000066.
Is a new building planned at 12626 International Pkwy?
The available City of Dallas record describes only a gas test and does not identify a new building project.
What business is opening at 12626 International Pkwy?
The permit record does not name a business or tenant. It describes a gas test.
Also being built nearby
All of 75228- 12623 International PkwyOct 19, 2020Replace or modify existing hvac · 13 m away
- 12600 International PkwyNov 13, 2025Gas test · 17 m away
- 12656 International PkwyJan 11, 2026Gas line test · 19 m away
- 12010 Corporate DrJan 5, 2021Remove 59 ast in the interior and exterior from the site. no build back of tanks · 156 m away
- 12020 Corporate DrDec 18, 2020Gas test · 170 m away
- 12623 International DrMar 2, 2026Zo bu no work has been performed. we bought the building as is and signed a new lease on at the property. our tenant applied for c of o but we were told the current floor plan does not match the existing floor plan the city has on record. at one point the building was two suites but it is currently one suite. when we bought the building it only had 1 set of utility meters for each utility · 176 m away
- 3001 Weather Vane LnAug 21, 2026Replace 3 ton complete heat pump system · 183 m away
- 12790 International PkwyFeb 6, 2026Gas tests/ minor gas repairs - 2 seperate addresses to test - first has co - 2nd address co is pending work on access road of 635 · 246 m away
- 3121 Santa Anna AveMay 8, 2026Replace hvac system with 3 ton goodman deluxe vertical heat pump; no duct work · 270 m away
- 3105 Santa Anna AveSep 10, 2026Water relay · 273 m away
- 12097 Corporate DrJul 22, 20261) install new concrete pad for oncor transformer.2) install all service conduit & wiring from transformer pad to building disconnect · 278 m away
- 12102 Corporate DrDec 5, 2025Perform a full gas pressure test to identify and locate any gas leaks. meter is currently locked and will require release through the proper permitting process prior to restoring service · 285 m away