1714 Loree Dr
Dallas, TX 75228
Composition shingles to be replaced at 1714 Loree Dr
A residential roofing permit indicates the existing composition shingles at 1714 Loree Dr will be removed and replaced with new composition shingles. The City of Dallas permit was filed on October 7, 2026, under permit RES-ROOF-26-001722.
Summarized from City of Dallas records · updated Oct 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2026
- since Oct 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1714 Loree Dr
What is being built at 1714 Loree Dr?
A City of Dallas residential roofing permit indicates that old composition shingles will be removed and replaced with new composition shingles. The record does not describe new construction.
Is a new home being built at 1714 Loree Dr?
The available record is for residential roofing work, not a new home. It describes replacing composition shingles.
When was the roofing permit filed for 1714 Loree Dr?
The permit was filed on October 7, 2026.
What is the permit number for 1714 Loree Dr?
The City of Dallas residential roofing permit number is RES-ROOF-26-001722.
What kind of shingles are being installed at 1714 Loree Dr?
The permit describes removing old composition shingles and installing new composition shingles.
Also being built nearby
All of 75228- 1703 Loree DrSep 15, 2026Gas line (gas pressure test) & water heater · 30 m away
- 1746 Loree DrOct 13, 2026Hvac changeout: remove existing system and install new 4-ton gas horizontal complete hvac system; no structural change · 37 m away
- 1723 Loree DrNov 13, 2025Gas line repipe · 44 m away
- 1705 Mariposa DrNov 20, 2020Addition of detached garage · 89 m away
- 1630 Loree DrJul 24, 2025Remove old composition shingles & install new composition shingles · 93 m away
- 1722 Quadrangle DrOct 14, 2026Gas service. leak fixed at meter · 107 m away
- 9630 Carnegie DrAug 26, 2026Electric to pool · 133 m away
- 1641 Quadrangle DrSep 28, 2026We will replace all drain line underneath the home, replace laundry line, kitchen line all pipes underneath the bathroom for sewer. we also will be replacing the main line to the front yard where it connects to existing pvc cleanouts. we will make access hole in flower bed to get underneath the home. we will strap all pipe as needed underneath the home to ensure a proper slope for sewer to flow correctly. we will remove toilet to replace flange · 145 m away
- 9647 Carnegie DrAug 22, 2025Partial water repipe · 148 m away
- 9654 Cloister DrJun 27, 2025Replace 4ton base horizontal gas system · 165 m away
- 1737 Mariposa DrNov 12, 2025Gas pressure test for gas service · 170 m away
- 9715 Cloister DrAug 17, 2026Replace hvac · 199 m away