9647 Carnegie Dr
Dallas, TX 75228
9647 Carnegie Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 9647 Carnegie Dr, Dallas, TX 75228. The most recent, filed August 22, 2025, covers: “Partial water repipe”.
Compiled from City of Dallas records · updated Aug 22, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 22, 2025
- since Aug 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9647 Carnegie Dr
What is being built at 9647 Carnegie Dr?
The latest filing (City of Dallas permit RES-PLM-25-004000, August 22, 2025) covers partial water repipe.
How many permits and filings does 9647 Carnegie Dr have?
2 filings across 2 projects, from August 22, 2025 to August 22, 2025.
Is there other construction near 9647 Carnegie Dr?
Yes. Nearby filings include 9630 Carnegie Dr (electric to pool, Aug 26, 2026); 1630 Loree Dr (remove old composition shingles & install new composition shingles, Jul 24, 2025); 1641 Quadrangle Dr (we will replace all drain line underneath the home, replace laundry line, kitchen line all pipes underneath the bathroom for sewer. we also will be replacing the main line to the front yard where it connects to existing pvc cleanouts. we will make access hole in flower bed to get underneath the home. we will strap all pipe as needed underneath the home to ensure a proper slope for sewer to flow correctly. we will remove toilet to replace flange, Sep 28, 2026).
How do I get alerts for new permits at 9647 Carnegie Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 9630 Carnegie DrAug 26, 2026Electric to pool · 15 m away
- 1630 Loree DrJul 24, 2025Remove old composition shingles & install new composition shingles · 68 m away
- 1641 Quadrangle DrSep 28, 2026We will replace all drain line underneath the home, replace laundry line, kitchen line all pipes underneath the bathroom for sewer. we also will be replacing the main line to the front yard where it connects to existing pvc cleanouts. we will make access hole in flower bed to get underneath the home. we will strap all pipe as needed underneath the home to ensure a proper slope for sewer to flow correctly. we will remove toilet to replace flange · 73 m away
- 9723 Carnegie DrDec 2, 2025Installation of a grid tied, roof mounted, solar pv system with mpu · 122 m away
- 9727 Carnegie DrNov 5, 2026Small leak fixed · 137 m away
- 1646 Mccosh DrNov 3, 2026Gas test · 146 m away
- 1714 Loree DrOct 7, 2026Remove old composition shingles & install new composition shingles · 148 m away
- 1722 Quadrangle DrOct 14, 2026Gas service. leak fixed at meter · 160 m away
- 9610 El Patio DrSep 2, 2025Remove old driveway and install a new driveway 68 x 18 ft. install new approach 18 x 10 ft with a metal drain 1 x 18 ft · 164 m away
- 1703 Loree DrSep 15, 2026Gas line (gas pressure test) & water heater · 170 m away
- 1714 Mccosh DrNov 9, 2026Gas pressure test · 182 m away
- 1746 Loree DrOct 13, 2026Hvac changeout: remove existing system and install new 4-ton gas horizontal complete hvac system; no structural change · 183 m away