2129 Centerville Rd
Dallas, TX 75228
Roof replacement permitted at 2129 Centerville Rd
A residential permit filed May 27, 2026, covers replacing the main structure’s asphalt shingles with GAF Timberline ArmorShield II, IR Class 4 shingles. The permit record does not report a project valuation or square footage.
Summarized from City of Dallas records · updated May 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 27, 2026
- since May 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRe-roof of main structure, replace current asphalt shingles with gaf timberline armorshield ii, ir class 4
Re-roof of main structure, replace current asphalt shingles with gaf timberline armorshield ii, ir class 4
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 2129 Centerville Rd
What is being built at 2129 Centerville Rd?
A City of Dallas permit covers re-roofing the main structure, replacing its existing asphalt shingles with GAF Timberline ArmorShield II, IR Class 4 shingles.
When was the roof replacement at 2129 Centerville Rd permitted?
The City of Dallas filed permit RES-ROOF-26-000835 on May 27, 2026.
Is a new house being built at 2129 Centerville Rd?
The available permit is for re-roofing the main structure, not for building a new house.
What shingles are being installed at 2129 Centerville Rd?
The permit description specifies GAF Timberline ArmorShield II, IR Class 4 shingles, replacing the existing asphalt shingles.
How much will the roof replacement at 2129 Centerville Rd cost?
The permit record does not report a project valuation or cost.
Also being built nearby
All of 75228- 10720 Galena StMay 11, 2025Install new electrical service · 56 m away
- 10719 Galena StOct 31, 2025It is recommended at the home to adjust 11 existing remedial piers along with reshiming across the interior · 68 m away
- 10643 Galena StJun 20, 2025Gas test · 111 m away
- 2135 Fenwick DrMay 28, 2025Repair damaged service knocked down by tree · 129 m away
- 2139 Fenwick DrMar 5, 2026Repairs to weather head · 131 m away
- 2134 Fenwick DrAug 7, 2025Gas test · 141 m away
- 2129 Montalba AveApr 22, 2026Replace building sewer line in the back yard and tie into existing clean outs and city sewer tap · 176 m away
- 2231 Centerville RdMar 1, 2026Replacing approximatley 80ft of gas line · 197 m away
- 2230 Centerville RdOct 19, 2026Natural gas test with no repairs · 205 m away
- 2064 Farola DrApr 21, 2026Gas test · 221 m away
- 2134 Monterrey AveJan 20, 2026Gas test · 232 m away
- 2065 Farola DrApr 22, 2026Gas test · 238 m away