2219 Healey Dr
Dallas, TX 75228
2219 Healey Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 2219 Healey Dr, Dallas, TX 75228. The most recent, filed September 9, 2025, covers: “Excavate approx 40 feet in order to replace broken clay pipe with new sch 40 pvc pipe. excavate approx 75 in crawl space area in order to replace broken cast iron pipe with new sch 40 pvc pipe”.
Compiled from City of Dallas records · updated Sep 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 9, 2025
- since Sep 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExcavate approx 40 feet in order to replace broken clay pipe with new sch 40 pvc pipe. excavate approx 75 in crawl space area in order to replace broken cast iron pipe with new sch 40 pvc pipe
Excavate approx 40 feet in order to replace broken clay pipe with new sch 40 pvc pipe. excavate approx 75 in crawl space area in order to replace broken cast iron pipe with new sch 40 pvc pipe
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 2219 Healey Dr
What is being built at 2219 Healey Dr?
The latest filing (City of Dallas permit RES-PLM-25-004677, September 9, 2025) covers excavate approx 40 feet in order to replace broken clay pipe with new sch 40 pvc pipe. excavate approx 75 in crawl space area in order to replace broken cast iron pipe with new sch 40 pvc pipe.
How many permits and filings does 2219 Healey Dr have?
1 filing across 1 project, from September 9, 2025 to September 9, 2025.
What is being built near Dw Furgeson in Dallas?
2219 Healey Dr is about 165 m from Dw Furgeson (9888 Ferguson Rd). Its latest filing is for excavate approx 40 feet in order to replace broken clay pipe with new sch 40 pvc pipe. excavate approx 75 in crawl space area in order to replace broken cast iron pipe with new sch 40 pvc pipe.
Is there other construction near 2219 Healey Dr?
Yes. Nearby filings include 2203 Healey Dr (remove all existing cast-iron under pier and beam. install new schedule 40 pvc for both restrooms, Oct 14, 2026); 2249 Larry Dr (sewer yard line replacement, Jul 22, 2026); 2115 Healey Dr (50 gal gas water heater, Nov 9, 2026).
How do I get alerts for new permits at 2219 Healey Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2203 Healey DrOct 14, 2026Remove all existing cast-iron under pier and beam. install new schedule 40 pvc for both restrooms · 22 m away
- 2249 Larry DrJul 22, 2026Sewer yard line replacement · 96 m away
- 2115 Healey DrNov 9, 202650 gal gas water heater · 106 m away
- 9915 Ferguson RdNov 17, 202640 gal gas water heater · 117 m away
- 9910 Lingo LnMay 28, 2025Main electrical upgrade · 124 m away
- 9914 Lingo LnFeb 5, 20263rd party plan reviewinstallation of duracell battery · 136 m away
- 2112 Clarksdale DrMay 21, 2025Sewer and drain repipe · 161 m away
- 9888 Ferguson Rd · Dw Furgeson LLCSep 4, 2026Clean and show, vacant unit · 165 m away
- 9924 Lingo LnOct 9, 2026Install hvac system · 166 m away
- 9865 Kingsman DrAug 11, 2026Mcr constructing a new retaing wall made out of natural milsap stone · 181 m away
- 9970 Ferguson RdAug 4, 2025Traffic signal · 198 m away
- 9804 Ferguson RdApr 6, 2026Excavate and remove the old 75-gallon steel grease trap and install a new 1500-gallon composite material grease trap and connect it to the existing drain lines. install 2-way cleanouts on the inlet and outlet sides, as well as a sample well on the outlet side · 203 m away