9804 Ferguson Rd
Dallas, TX 75228
Grease trap replacement and roof work at 9804 Ferguson Rd
Permits indicate a new 1,500-gallon composite grease trap is being installed at 9804 Ferguson Rd, replacing an old 75-gallon steel trap. The City of Dallas issued the plumbing permit on April 6, 2026. A separate roofing permit, filed October 15, 2025, covers installing a new roof system over the existing roof.
Summarized from City of Dallas records · updated Apr 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 6, 2026
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsExcavate and remove the old 75-gallon steel grease trap and install a new 1500-gallon composite material grease trap and connect it to the existing drain lines. install 2-way cleanouts on the inlet and outlet sides, as well as a sample well on the outlet side
Excavate and remove the old 75-gallon steel grease trap and install a new 1500-gallon composite material grease trap and connect it to the existing drain lines. install 2-way cleanouts on the inlet and outlet sides, as well as a sample well on the outlet side
City of Dallas permitCommercial Plumbing PermitScope of work new roof: layover existing* this proposal is to install a new 15 year 40 mil pvc duro-last single ply roof system over existing roof system.* provide and install duro-blue slip sheet over the field and walls' existing roof system. mechanically attach.* provide and install duro-last 40 mil pvc membrane over the duro-blue, m.a. to the field and parapet walls.* run new duro-last up and over parapets. this requires removing old rusted coping cap & installing new compression clip with 4" dark bronze cover around entire perimeter.* provide & install duro-last flashing to all penetrations (curbs, pipe, etc.) qty = 12* install new 4x4 pressure treated blocks under condensers.* provide, fabricate & install 6" box gutters and three 4" x 6" downspouts on rear elevation. dark bronze.f = 2,550 sq ft; w = 615 sq ft; total = 3,165 sq ftexcludes: tear off.includes: equipment, dumpster, permit
Scope of work new roof: layover existing* this proposal is to install a new 15 year 40 mil pvc duro-last single ply roof system over existing roof system.* provide and install duro-blue slip sheet over the field and walls' existing roof system. mechanically attach.* provide and install duro-last 40 mil pvc membrane over the duro-blue, m.a. to the field and parapet walls.* run new duro-last up and over parapets. this requires removing old rusted coping cap & installing new compression clip with 4" dark bronze cover around entire perimeter.* provide & install duro-last flashing to all penetrations (curbs, pipe, etc.) qty = 12* install new 4x4 pressure treated blocks under condensers.* provide, fabricate & install 6" box gutters and three 4" x 6" downspouts on rear elevation. dark bronze.f = 2,550 sq ft; w = 615 sq ft; total = 3,165 sq ftexcludes: tear off.includes: equipment, dumpster, permit
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 9804 Ferguson Rd
What is being built at 9804 Ferguson Rd?
City of Dallas permits cover replacing an old 75-gallon steel grease trap with a new 1,500-gallon composite trap and installing a new roof system over the existing roof.
Is a new building going up at 9804 Ferguson Rd?
The available permits describe plumbing and roofing work, not construction of a new building.
When was the grease trap permit filed for 9804 Ferguson Rd?
The City of Dallas issued commercial plumbing permit COM-PLM-26-001281 on April 6, 2026.
What kind of grease trap is being installed at 9804 Ferguson Rd?
The permit describes a 1,500-gallon composite grease trap connected to existing drain lines, with cleanouts and a sample well.
When was the roof permit filed at 9804 Ferguson Rd?
Commercial roofing permit COM-ROOF-25-000146 was filed on October 15, 2025.
How much roof work is listed in the permit for 9804 Ferguson Rd?
The roofing permit description lists a total of 3,165 square feet for the work. It specifies installing a new roof system over the existing roof.
Also being built nearby
All of 75228- 9796 Ferguson RdAug 6, 2026Remove all duct work. move unit approximately 5 feet. replace ductwork · 5 m away
- 9750 Ferguson RdDec 18, 2025Demolish current driveway approach and pour new driveway approach. and driveway · 36 m away
- 9888 Ferguson Rd · Dw Furgeson LLCSep 4, 2026Clean and show, vacant unit · 56 m away
- 2328 Larry DrSep 3, 2026Riser repair only/service repair · 102 m away
- 2334 Larry DrNov 16, 2026Gas main replacement · 116 m away
- 2249 Larry DrJul 22, 2026Sewer yard line replacement · 134 m away
- 2145 Province LnJul 7, 2026New drive approach · 157 m away
- 2217 Oates DrSep 24, 2020Remove (3) antennas, add (6) antennas, retain (3) tmas, sw · 199 m away
- 2124 Province LnSep 4, 2025Main panel relocate from interior master closet to exterior - upgrade of meter can as well“ · 201 m away
- 2219 Healey DrSep 9, 2025Excavate approx 40 feet in order to replace broken clay pipe with new sch 40 pvc pipe. excavate approx 75 in crawl space area in order to replace broken cast iron pipe with new sch 40 pvc pipe · 203 m away
- 2308 Oates DrMay 23, 2025Install rpz for ice maker · 204 m away
- 2367 Larry DrAug 17, 2026New hvac and ductwork · 206 m away