2327 Highwood Dr
Dallas, TX 75228
Roof replacement permitted at 2327 Highwood Dr
A residential roofing permit was issued for replacement composition shingles at 2327 Highwood Dr in Dallas. The City of Dallas permit, RES-ROOF-26-000479, was filed April 8, 2026.
Summarized from City of Dallas records · updated Apr 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 8, 2026
- since Apr 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2327 Highwood Dr
What is happening at 2327 Highwood Dr in Dallas?
A City of Dallas residential roofing permit covers removing the old composition shingles and installing new composition shingles. The permit was filed April 8, 2026.
Is a new house being built at 2327 Highwood Dr?
The available record is for roof replacement, not new home construction. It is permit RES-ROOF-26-000479, filed April 8, 2026.
When was the roof replacement permitted at 2327 Highwood Dr?
The City of Dallas filed the residential roofing permit on April 8, 2026.
What kind of shingles are being installed at 2327 Highwood Dr?
The permit description says the work is to remove old composition shingles and install new composition shingles.
What is permit RES-ROOF-26-000479 for?
The City of Dallas permit is for residential roof work at 2327 Highwood Dr: removing old composition shingles and installing new ones. It was filed April 8, 2026.
Also being built nearby
All of 75228- 2318 Highwood DrJul 27, 2026Sewer repipe · 26 m away
- 2337 Highwood DrJul 10, 2026Shower to shower replacement with new valve · 29 m away
- 10040 Lingo LnJun 3, 2025Properly remove and replace roof as per specs · 65 m away
- 2356 Highwood DrSep 21, 2020Install fence · 86 m away
- 2331 Materhorn DrSep 29, 2025Gas test · 91 m away
- 2363 Highwood DrApr 13, 20263 ton base upflow gas system · 103 m away
- 2324 Materhorn DrMar 5, 2026New building associate with permit #res-alt-add-25-001335 · 103 m away
- 2316 Materhorn DrDec 5, 2025Electrical remodel home will be rewired · 106 m away
- 2312 Hartline DrOct 28, 20263 ton base horizontal gas system · 108 m away
- 2321 Hartline DrJul 29, 2026• replacing 16 lf of beam.• resetting/re-shimming 1415.18 sq ft of the structure.• creating two tunnel access points.• tunneling 4 lf · 112 m away
- 2348 Materhorn DrAug 29, 2025Gas repair/test · 117 m away
- 2335 Hartline DrMay 11, 2026Gas test · 118 m away