2337 Highwood Dr
Dallas, TX 75228
Foundation and shower repairs permitted at 2337 Highwood Dr
City of Dallas permits indicate foundation repairs at the residence on April 15, 2026, including joist, sill plate and subfloor work. A shower replacement with a new valve was permitted on July 10, 2026.
Summarized from City of Dallas records · updated Jul 10, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 10, 2026
- since Apr 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSister 110lf of 2x6 joist, install 35lf of sill plate, install 36 sq ft of subflooring, reset/reshim
Sister 110lf of 2x6 joist, install 35lf of sill plate, install 36 sq ft of subflooring, reset/reshim
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 2337 Highwood Dr
What work is being done at 2337 Highwood Dr?
City of Dallas permits list foundation repairs and a shower replacement with a new valve. The records do not indicate new construction.
When was the foundation repair permit filed at 2337 Highwood Dr?
The City of Dallas foundation repair permit, RES-FDN-26-000316, was filed on April 15, 2026. It lists joist, sill plate and subfloor work, along with resetting and reshimming.
What plumbing work was permitted at 2337 Highwood Dr?
Permit RES-PLM-26-007137 lists a shower-to-shower replacement with a new valve. It was filed on July 10, 2026.
Is a new house being built at 2337 Highwood Dr?
The available City of Dallas records list residential foundation repair and plumbing work, not a new-home construction permit.
How many permits are recorded for 2337 Highwood Dr?
The records show two City of Dallas permits: one for foundation repair filed April 15, 2026, and one for plumbing work filed July 10, 2026.
Also being built nearby
All of 75228- 2327 Highwood DrApr 8, 2026Remove old composition shingles & install new composition shingles · 29 m away
- 2318 Highwood DrJul 27, 2026Sewer repipe · 51 m away
- 2356 Highwood DrSep 21, 2020Install fence · 58 m away
- 2363 Highwood DrApr 13, 20263 ton base upflow gas system · 74 m away
- 10040 Lingo LnJun 3, 2025Properly remove and replace roof as per specs · 93 m away
- 2331 Materhorn DrSep 29, 2025Gas test · 96 m away
- 2373 Highwood DrDec 2, 2025Mcr installation of a grid tied, roof mounted, solar pv system · 103 m away
- 2335 Hartline DrMay 11, 2026Gas test · 103 m away
- 2321 Hartline DrJul 29, 2026• replacing 16 lf of beam.• resetting/re-shimming 1415.18 sq ft of the structure.• creating two tunnel access points.• tunneling 4 lf · 106 m away
- 2341 Hartline DrDec 18, 2025New gas yard service · 108 m away
- 2312 Hartline DrOct 28, 20263 ton base horizontal gas system · 109 m away
- 2350 Hartline DrDec 4, 2025Replace existing with 3 ton basic gas upflow system · 110 m away