2640 Heatherwood Dr
Dallas, TX 75228
2640 Heatherwood Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 2640 Heatherwood Dr, Dallas, TX 75228. The most recent, filed September 8, 2025, covers: “House rewire and service upgrade”.
Compiled from City of Dallas records · updated Sep 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 8, 2025
- since Sep 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2640 Heatherwood Dr
What is being built at 2640 Heatherwood Dr?
The latest filing (City of Dallas permit RES-ELC-25-002845, September 8, 2025) covers house rewire and service upgrade.
How many permits and filings does 2640 Heatherwood Dr have?
2 filings across 2 projects, from September 8, 2025 to September 8, 2025.
Is there other construction near 2640 Heatherwood Dr?
Yes. Nearby filings include 2641 Heatherwood Dr (roof installation (refoofing) at 2641 heatherwood dr. dallas, texas 75228, Feb 20, 2026); 2647 Heatherwood Dr (sewer service & tunneling (full repipe), Oct 28, 2026); 2659 Heatherwood Dr (3 ton base upflow gas system, Aug 5, 2026).
How do I get alerts for new permits at 2640 Heatherwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2641 Heatherwood DrFeb 20, 2026Roof installation (refoofing) at 2641 heatherwood dr. dallas, texas 75228 · 13 m away
- 2647 Heatherwood DrOct 28, 2026Sewer service & tunneling (full repipe) · 24 m away
- 2659 Heatherwood DrAug 5, 20263 ton base upflow gas system · 60 m away
- 2665 Heatherwood DrMar 25, 2026Installed 50 gallon gas water heater located in hallway closet · 80 m away
- 2647 Beechmont DrAug 24, 2026200 service repair · 81 m away
- 2612 Heatherwood DrMay 19, 2026Trench up to 90 feet to replace the kitchen and laundry drain line with new 2 inch pvc pipe and connected into the main close to the sidewalk that is 5 feet deep. this will also include for us to create an access hole by the mainline cleanouts to replace the remaining cast-iron and the broken offset pipe to where it ties in from cast-iron to pvc, we will remove cast-iron and replace it with new schedule 40 pvc pipe · 91 m away
- 2623 Beechmont DrJul 27, 2026Cold water slab leak repair under slab · 97 m away
- 2670 Heatherwood DrSep 18, 2025-40lf 8' cedar board on board4-5 man fence crewkickboard, trim, & top capdemo of old fence / haul off-custom front fence with gate4' height x 140' length · 99 m away
- 2624 Beechmont DrJun 4, 2026Replace 5 ton gas hvac unit · 104 m away
- 2617 Beechmont DrApr 13, 2026Water heater replace in garage closet · 110 m away
- 2676 Heatherwood DrJul 28, 202640 gall gas garage closet · 118 m away
- 9659 Vinewood DrNov 9, 202635' sewer tunnel 30' sewer yard service · 132 m away