9659 Vinewood Dr
Dallas, TX 75228
Sewer service work and water heater replacement at 9659 Vinewood Dr
City of Dallas permits indicate sewer service work and a gas water heater replacement at this residence. The water heater permit was filed August 28, 2026 (RES-PLM-26-009106), and a permit for a 35-foot sewer tunnel and 30-foot sewer yard service was filed November 9, 2026 (RES-PLM-26-012098).
Summarized from City of Dallas records · updated Nov 9, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 9, 2026
- since Aug 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9659 Vinewood Dr
What work is permitted at 9659 Vinewood Dr?
City of Dallas records show a gas water heater replacement and sewer service work. The sewer permit describes a 35-foot tunnel and 30-foot yard service.
Is a new building being built at 9659 Vinewood Dr?
The records provided show residential plumbing permits, not a permit for a new building.
When was the sewer work at 9659 Vinewood Dr permitted?
The City of Dallas filed the sewer permit on November 9, 2026. Its permit number is RES-PLM-26-012098.
Was a water heater replacement permitted at 9659 Vinewood Dr?
Yes. A residential plumbing permit filed August 28, 2026, describes replacing the gas water heater in the hall closet. The permit number is RES-PLM-26-009106.
How long is the sewer tunnel at 9659 Vinewood Dr?
The November 9, 2026 permit description specifies a 35-foot sewer tunnel and a 30-foot sewer yard service.
How much will the work at 9659 Vinewood Dr cost?
The available City of Dallas records do not report a project cost.
Also being built nearby
All of 75228- 1526 Oates DrOct 16, 2025Underground sewer repair · 100 m away
- 9727 Vinewood DrJun 2, 2026Tare off and replace shingles complete reroof · 103 m away
- 2612 Heatherwood DrMay 19, 2026Trench up to 90 feet to replace the kitchen and laundry drain line with new 2 inch pvc pipe and connected into the main close to the sidewalk that is 5 feet deep. this will also include for us to create an access hole by the mainline cleanouts to replace the remaining cast-iron and the broken offset pipe to where it ties in from cast-iron to pvc, we will remove cast-iron and replace it with new schedule 40 pvc pipe · 105 m away
- 1506 Oates DrJan 20, 2026Gas line yard replacement up to 50' and repipe home · 117 m away
- 1422 Foxgrove CirSep 11, 2025Removing one layer of shingles and installing new roof with one layer of shingles · 119 m away
- 2641 Heatherwood DrFeb 20, 2026Roof installation (refoofing) at 2641 heatherwood dr. dallas, texas 75228 · 123 m away
- 1412 Foxgrove CirJul 8, 2025Tear off existing shingles and replace with tamko hd class 4 weathered wood color shingles · 129 m away
- 1417 Foxgrove CirOct 14, 2026Installing water heater in the hall closet · 130 m away
- 2640 Heatherwood DrSep 8, 2025House rewire and service upgrade · 132 m away
- 1509 Oates DrSep 8, 2026Storm damage to riser replaced riser and meter base · 137 m away
- 2647 Heatherwood DrOct 28, 2026Sewer service & tunneling (full repipe) · 139 m away
- 1501 Oates DrApr 15, 2026Removing existing shower and tub, replacing with new fixtures and shower pan liner · 145 m away