2938 Andrea Ln
Dallas, TX 75228
Gas test permit filed at 2938 Andrea Ln
A residential plumbing permit for a gas test was filed at 2938 Andrea Ln in Dallas on September 8, 2026. The City of Dallas record does not describe a new building or other construction work.
Summarized from City of Dallas records · updated Sep 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 8, 2026
- since Sep 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2938 Andrea Ln
What is being built at 2938 Andrea Ln?
The City of Dallas record lists a residential plumbing permit for a gas test, filed September 8, 2026. It does not describe a new building.
What work is the permit for at 2938 Andrea Ln?
The permit description is “Gas test.” The record does not give further details about the work.
When was the gas test permit filed at 2938 Andrea Ln?
It was filed on September 8, 2026, under permit RES-PLM-26-009519.
Is a new home being built at 2938 Andrea Ln?
The available City of Dallas record does not indicate new home construction. It lists one residential plumbing permit for a gas test.
What type of permit was issued for 2938 Andrea Ln?
The record identifies it as a Residential Plumbing Permit, with the description “Gas test.”
Also being built nearby
All of 75228- 2945 Andrea LnNov 6, 2026Sewer line replacement · 15 m away
- 2931 Millmar DrAug 10, 2025Gas test for meter unlock · 84 m away
- 3005 Andrea LnJul 28, 2026Install 28 squares of 30 year shingles, weathered wood · 101 m away
- 3032 Crest Ridge DrAug 4, 2026Service riser repair · 114 m away
- 3018 Crest Ridge DrApr 1, 2026Replacing storm damaged fence on both sides of the property and going up to 8 feet with the new fence. replacing 140 linear feet of fence with one gate on the left front side of the house when you're facing the street · 128 m away
- 3019 Millmar DrOct 15, 2026Wire na new house · 142 m away
- 2820 Andrea LnJan 7, 2026Gas test only · 164 m away
- 3125 Crest Ridge DrSep 15, 2020Remove existing roof and install new roof · 173 m away
- 2811 Andrea LnDec 2, 2025Gas test, and bring gas water heater up to code · 178 m away
- 2923 Materhorn DrAug 13, 2026The approach will be approximately 16 ft. × 11 ft. with 3/8-inch rebar spaced at 12 inches on center. the driveway will be approximately 33 ft. × 16 ft. with a concrete thickness of 4 inches and 3/8-inch rebar spaced at 18 inches on center. redwood approach dowels will be installed as required. concrete will be 3,000 psi · 179 m away
- 2931 Hillglenn RdMay 22, 2025Full shingle re roof (25sq) · 180 m away
- 2927 Hillglenn RdAug 20, 2025Gas relay · 181 m away