Active · latest filing Nov 2026Residential
2945 Andrea Ln
Dallas, TX 75228
Sewer line replacement permitted at 2945 Andrea Ln
A sewer line replacement at 2945 Andrea Ln in Dallas was permitted on November 6, 2026. City of Dallas permit RES-PLM-26-012047 lists the work as a residential plumbing permit.
Summarized from City of Dallas records · updated Nov 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 6, 2026
- since Nov 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2945 Andrea Ln
What is being built at 2945 Andrea Ln?
A City of Dallas permit lists sewer line replacement at the residential property. It does not describe a new building.
When was the sewer line replacement permitted?
The permit was filed on November 6, 2026.
What is the permit number for work at 2945 Andrea Ln?
The permit number is RES-PLM-26-012047.
Is a new home being built at 2945 Andrea Ln?
The available permit is for sewer line replacement, not new home construction.
Who issued the permit for 2945 Andrea Ln?
The permit record is from the City of Dallas and classifies the work as a residential plumbing permit.
Also being built nearby
All of 75228- 2938 Andrea LnSep 8, 2026Gas test · 15 m away
- 3005 Andrea LnJul 28, 2026Install 28 squares of 30 year shingles, weathered wood · 91 m away
- 2931 Millmar DrAug 10, 2025Gas test for meter unlock · 98 m away
- 3032 Crest Ridge DrAug 4, 2026Service riser repair · 104 m away
- 3018 Crest Ridge DrApr 1, 2026Replacing storm damaged fence on both sides of the property and going up to 8 feet with the new fence. replacing 140 linear feet of fence with one gate on the left front side of the house when you're facing the street · 120 m away
- 3019 Millmar DrOct 15, 2026Wire na new house · 143 m away
- 3125 Crest Ridge DrSep 15, 2020Remove existing roof and install new roof · 158 m away
- 2923 Materhorn DrAug 13, 2026The approach will be approximately 16 ft. × 11 ft. with 3/8-inch rebar spaced at 12 inches on center. the driveway will be approximately 33 ft. × 16 ft. with a concrete thickness of 4 inches and 3/8-inch rebar spaced at 18 inches on center. redwood approach dowels will be installed as required. concrete will be 3,000 psi · 169 m away
- 2820 Andrea LnJan 7, 2026Gas test only · 173 m away
- 3106 Andrea LnDec 1, 2025Install 40 gallon gas water heater (swap out) · 182 m away
- 2811 Andrea LnDec 2, 2025Gas test, and bring gas water heater up to code · 186 m away
- 2807 Andrea LnAug 7, 2026Install 9 concrete piers, install 10 lf beam, 12 lf of sill plate, and reset reshim · 192 m away