Active · latest filing Nov 2026Commercial
2945 N Buckner Blvd
Dallas, TX 75228
Drive-thru canopy permitted at 2945 N Buckner Blvd
A drive-thru canopy is covered by a City of Dallas commercial accessory structure permit filed November 11, 2026. The filing is permit COM-ACC-26-000301.
Summarized from City of Dallas records · updated Nov 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2945 N Buckner Blvd
What is being built at 2945 N Buckner Blvd?
A City of Dallas permit describes a drive-thru canopy at the address. It was filed November 11, 2026.
When was the drive-thru canopy permitted at 2945 N Buckner Blvd?
The City of Dallas permit was filed on November 11, 2026.
What is permit COM-ACC-26-000301 for?
The permit describes a drive-thru canopy at 2945 N Buckner Blvd in Dallas.
Is the project at 2945 N Buckner Blvd a commercial permit?
Yes. The City of Dallas record classifies it as a commercial accessory structure permit.
Does the permit at 2945 N Buckner Blvd cover a drive-thru canopy?
Yes. The permit description is “Drive thru canopy.”
Also being built nearby
All of 75228- 2939 N Buckner BlvdJun 11, 20251 story retail shell building · 46 m away
- 2998 Peavy RdDec 8, 2020Service release no work · 62 m away
- 3004 N Buckner BlvdJul 20, 2026Txdot 0581-01-165_dallas_traf signal improv- electrical permit request for installation of traffic signal poles, signal heads, conduit, wiring, and controller equipment. work also includes electrical connections, testing, and coordination to ensure proper operation of upgraded traffic signal systems in accordance with project plans · 159 m away
- 3030 N Buckner BlvdAug 18, 2026Exterior facade facelift. no addition of square foot · 175 m away
- 2880 Peavy RdNov 13, 2025Mcr remove 5' sliding glass door leading to apartment 1081 in building 16 of vista del sol apartments on 2880 peavy rd. and replace with 3' exterior door and frame. frame with 2x4 and install sheathing and siding on exterior and 1/2 gyp. bd. on interior · 188 m away
- 3120 N Buckner BlvdMay 20, 2026Site utilities water and sewer · 226 m away
- 1919 Abshire LnNov 9, 20264-ton condenser changeout & 88k btu furnace changeout · 243 m away
- 1951 Abshire LnJun 1, 2026Install 200a service, the existing one suffered damaged and needs to be replaced · 273 m away
- 3211 N Buckner BlvdOct 6, 2020Alcohol certification · 308 m away
- 2047 Abshire LnAug 7, 2026Reroof existing roof with lifetime laminate acritical shingle · 371 m away
- 8411 Cadenza LnFeb 17, 2026Gas test · 392 m away
- 8422 Cadenza LnJul 7, 2025Gas line repair · 404 m away