2998 Peavy Rd
Dallas, TX 75228
2998 Peavy Rd: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 2998 Peavy Rd, Dallas, TX 75228. The most recent, filed December 8, 2020, covers: “Service release no work”.
Compiled from City of Dallas records · updated Dec 8, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Dec 8, 2020
- since Dec 8, 2020
- Largest scope
- —
- Listed value
- $6
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 2998 Peavy Rd
What is being built at 2998 Peavy Rd?
The latest filing (City of Dallas permit 2012013077, December 8, 2020) covers service release no work.
How many permits and filings does 2998 Peavy Rd have?
2 filings across 2 projects, from December 8, 2020 to December 8, 2020.
How much is the construction at 2998 Peavy Rd worth?
Permits at this address list about $6 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 2998 Peavy Rd?
Yes. Nearby filings include 2945 N Buckner Blvd (drive thru canopy, Nov 16, 2026); 2939 N Buckner Blvd (1 story retail shell building, Jun 11, 2025); 3004 N Buckner Blvd (txdot 0581-01-165_dallas_traf signal improv- electrical permit request for installation of traffic signal poles, signal heads, conduit, wiring, and controller equipment. work also includes electrical connections, testing, and coordination to ensure proper operation of upgraded traffic signal systems in accordance with project plans, Jul 20, 2026).
How do I get alerts for new permits at 2998 Peavy Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2945 N Buckner BlvdNov 16, 2026Drive thru canopy · 62 m away
- 2939 N Buckner BlvdJun 11, 20251 story retail shell building · 95 m away
- 3004 N Buckner BlvdJul 20, 2026Txdot 0581-01-165_dallas_traf signal improv- electrical permit request for installation of traffic signal poles, signal heads, conduit, wiring, and controller equipment. work also includes electrical connections, testing, and coordination to ensure proper operation of upgraded traffic signal systems in accordance with project plans · 126 m away
- 3030 N Buckner BlvdAug 18, 2026Exterior facade facelift. no addition of square foot · 142 m away
- 2880 Peavy RdNov 13, 2025Mcr remove 5' sliding glass door leading to apartment 1081 in building 16 of vista del sol apartments on 2880 peavy rd. and replace with 3' exterior door and frame. frame with 2x4 and install sheathing and siding on exterior and 1/2 gyp. bd. on interior · 175 m away
- 1919 Abshire LnNov 9, 20264-ton condenser changeout & 88k btu furnace changeout · 192 m away
- 3120 N Buckner BlvdMay 20, 2026Site utilities water and sewer · 197 m away
- 1951 Abshire LnJun 1, 2026Install 200a service, the existing one suffered damaged and needs to be replaced · 219 m away
- 3211 N Buckner BlvdOct 6, 2020Alcohol certification · 287 m away
- 2047 Abshire LnAug 7, 2026Reroof existing roof with lifetime laminate acritical shingle · 312 m away
- 8411 Cadenza LnFeb 17, 2026Gas test · 331 m away
- 8422 Cadenza LnJul 7, 2025Gas line repair · 342 m away