9418 Mercer Dr
Dallas, TX 75228
9418 Mercer Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9418 Mercer Dr, Dallas, TX 75228. The most recent, filed September 15, 2025, covers: “Replace hvac complete system (x1)”.
Compiled from City of Dallas records · updated Sep 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 15, 2025
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9418 Mercer Dr
What is being built at 9418 Mercer Dr?
The latest filing (City of Dallas permit RES-MEC-25-002576, September 15, 2025) covers replace hvac complete system (x1).
How many permits and filings does 9418 Mercer Dr have?
1 filing across 1 project, from September 15, 2025 to September 15, 2025.
Is there other construction near 9418 Mercer Dr?
Yes. Nearby filings include 9424 Mercer Dr (drive way open aoroch, Jul 8, 2026); 9405 Mercer Dr (main breaker panel replacement 200amp, Apr 9, 2026); 9410 Springwater Dr (interior remodeling and second floor addition, Dec 8, 2025).
How do I get alerts for new permits at 9418 Mercer Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 9424 Mercer DrJul 8, 2026Drive way open aoroch · 11 m away
- 9405 Mercer DrApr 9, 2026Main breaker panel replacement 200amp · 29 m away
- 9410 Springwater DrDec 8, 2025Interior remodeling and second floor addition · 108 m away
- 9410 Creel Creek DrJun 3, 2026Replace building drains and building sewer · 137 m away
- 9336 Springwater DrApr 15, 2026Added an additional bath upstairs, remodeled/upgraded full bath upstairs, full bath downstairs, kitchen, and laundry room · 138 m away
- 9450 Springwater DrMay 6, 2025Repipe in crawlspace 2" and 3" sewer · 144 m away
- 9335 Mercer DrAug 8, 2025Updating to a 200 amp service · 151 m away
- 9336 Mercer DrSep 14, 20265 ton standard plus gas system upflow · 152 m away
- 9454 Springwater DrNov 18, 2026Install 10 steel piers under the home to stabilize the foundation · 163 m away
- 9505 Springwater DrSep 24, 2025Making tunnel access in the front of the home going underneath the house, 8 feet to make access and exposed buried cast-iron piping. after the cast-iron and access has been exposed and made we then will proceed with removing existing cast-iron only from underneath the home and after all has been removed, we then will proceed with installing new schedule for pvc · 163 m away
- 9325 Mercer DrMay 15, 2026Adding new concrete for a straight driveway from street curb to home gate by side of house · 168 m away
- 9329 Creel Creek DrNov 18, 2026Gas test with gas release · 177 m away