9454 Springwater Dr
Dallas, TX 75228
9454 Springwater Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9454 Springwater Dr, Dallas, TX 75228. The most recent, filed November 18, 2026, covers: “Install 10 steel piers under the home to stabilize the foundation”.
Compiled from City of Dallas records · updated Nov 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9454 Springwater Dr
What is being built at 9454 Springwater Dr?
The latest filing (City of Dallas permit RES-FDN-26-001040, November 18, 2026) covers install 10 steel piers under the home to stabilize the foundation.
How many permits and filings does 9454 Springwater Dr have?
1 filing across 1 project, from November 18, 2026 to November 18, 2026.
Is there other construction near 9454 Springwater Dr?
Yes. Nearby filings include 9450 Springwater Dr (repipe in crawlspace 2" and 3" sewer, May 6, 2025); 1909 S Buckner Blvd (exterior renovation new parapet wall, Jul 25, 2025); 1913 S Buckner Blvd (gas test for gas release only, Jul 23, 2026).
How do I get alerts for new permits at 9454 Springwater Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 9450 Springwater DrMay 6, 2025Repipe in crawlspace 2" and 3" sewer · 59 m away
- 1909 S Buckner BlvdJul 25, 2025Exterior renovation new parapet wall · 71 m away
- 1913 S Buckner BlvdJul 23, 2026Gas test for gas release only · 75 m away
- 1915 S Buckner BlvdJul 23, 2026Gas test only for meter release · 77 m away
- 1917 S Buckner BlvdJul 23, 2026Gas test only for meter release · 79 m away
- 1923 S Buckner BlvdJul 8, 2025Install 200 amp service for house panel and house lightsincluded are the following:install 15 wall packsinstall 15 sconce lightsinstall 25 recessed lights led low voltage lights cove lights · 86 m away
- 9505 Springwater DrSep 24, 2025Making tunnel access in the front of the home going underneath the house, 8 feet to make access and exposed buried cast-iron piping. after the cast-iron and access has been exposed and made we then will proceed with removing existing cast-iron only from underneath the home and after all has been removed, we then will proceed with installing new schedule for pvc · 88 m away
- 9512 Ash Creek DrMay 13, 2026Proposed area 550 sfremove existing roof system to a clean deckinstall high temperature ice and water shieldbrake down metal (onsite) to standing seam snap lock 1.5" seam 18" panel24 gauge metaltie into shingle roof and flash at gable ventreplace 2 pipe jacksinstall new metal edge · 99 m away
- 9509 Springwater DrJan 13, 2026Install a 1 & 1/2 ton electric system · 116 m away
- 1955 S Buckner BlvdJun 3, 2025Remove and replace 1 a/c package unit. no duct work modification · 120 m away
- 9516 Springwater DrNov 17, 2026Remove and replace shingles on the roof due to storm damage · 129 m away
- 9410 Springwater DrDec 8, 2025Interior remodeling and second floor addition · 132 m away