9516 Springwater Dr
Dallas, TX 75228
9516 Springwater Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 9516 Springwater Dr, Dallas, TX 75228. The most recent, filed November 17, 2026, covers: “Remove and replace shingles on the roof due to storm damage”.
Compiled from City of Dallas records · updated Nov 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 17, 2026
- since Nov 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9516 Springwater Dr
What is being built at 9516 Springwater Dr?
The latest filing (City of Dallas permit RES-ROOF-26-001993, November 17, 2026) covers remove and replace shingles on the roof due to storm damage.
How many permits and filings does 9516 Springwater Dr have?
2 filings across 2 projects, from November 17, 2026 to November 17, 2026.
Is there other construction near 9516 Springwater Dr?
Yes. Nearby filings include 9519 Springwater Dr (tree damage repair on meter and mast, Aug 4, 2026); 9509 Springwater Dr (install a 1 & 1/2 ton electric system, Jan 13, 2026); 9505 Springwater Dr (making tunnel access in the front of the home going underneath the house, 8 feet to make access and exposed buried cast-iron piping. after the cast-iron and access has been exposed and made we then will proceed with removing existing cast-iron only from underneath the home and after all has been removed, we then will proceed with installing new schedule for pvc, Sep 24, 2025).
How do I get alerts for new permits at 9516 Springwater Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 9519 Springwater DrAug 4, 2026Tree damage repair on meter and mast · 31 m away
- 9509 Springwater DrJan 13, 2026Install a 1 & 1/2 ton electric system · 36 m away
- 9505 Springwater DrSep 24, 2025Making tunnel access in the front of the home going underneath the house, 8 feet to make access and exposed buried cast-iron piping. after the cast-iron and access has been exposed and made we then will proceed with removing existing cast-iron only from underneath the home and after all has been removed, we then will proceed with installing new schedule for pvc · 57 m away
- 9410 Creel Creek DrJun 3, 2026Replace building drains and building sewer · 100 m away
- 9454 Springwater DrNov 18, 2026Install 10 steel piers under the home to stabilize the foundation · 129 m away
- 9504 Mercer DrApr 5, 2026Upgrade electrical service for both units duplex · 133 m away
- 9520 Mercer DrDec 15, 2025Gas repair with test · 162 m away
- 9522 Mercer DrJul 22, 2025Upgrading the service, new meter base for both suites and relocating panel out of closet · 169 m away
- 9512 Ash Creek DrMay 13, 2026Proposed area 550 sfremove existing roof system to a clean deckinstall high temperature ice and water shieldbrake down metal (onsite) to standing seam snap lock 1.5" seam 18" panel24 gauge metaltie into shingle roof and flash at gable ventreplace 2 pipe jacksinstall new metal edge · 169 m away
- 9450 Springwater DrMay 6, 2025Repipe in crawlspace 2" and 3" sewer · 185 m away
- 1909 S Buckner BlvdJul 25, 2025Exterior renovation new parapet wall · 199 m away
- 1913 S Buckner BlvdJul 23, 2026Gas test for gas release only · 203 m away