3256 Chapel Downs Dr
Dallas, TX 75229
3256 Chapel Downs Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 3256 Chapel Downs Dr, Dallas, TX 75229. The most recent, filed May 26, 2025, covers: “Replacing over head service and relocating main electric panel from the closet to the outside of the home”.
Compiled from City of Dallas records · updated May 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 26, 2025
- since May 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacing over head service and relocating main electric panel from the closet to the outside of the home
Replacing over head service and relocating main electric panel from the closet to the outside of the home
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 3256 Chapel Downs Dr
What is being built at 3256 Chapel Downs Dr?
The latest filing (City of Dallas permit RES-ELC-25-000342, May 26, 2025) covers replacing over head service and relocating main electric panel from the closet to the outside of the home.
How many permits and filings does 3256 Chapel Downs Dr have?
1 filing across 1 project, from May 26, 2025 to May 26, 2025.
Is there other construction near 3256 Chapel Downs Dr?
Yes. Nearby filings include 3248 Chapel Downs Dr (install 160' of 8' tall cedar fence. one elec drive gate, Nov 5, 2026); 3249 Chapel Downs Dr (replacing 2 ton heat pump system, Jan 2, 2026); 3241 Chapel Downs Dr (re roof, Feb 20, 2026).
How do I get alerts for new permits at 3256 Chapel Downs Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75229- 3248 Chapel Downs DrNov 5, 2026Install 160' of 8' tall cedar fence. one elec drive gate · 23 m away
- 3249 Chapel Downs DrJan 2, 2026Replacing 2 ton heat pump system · 26 m away
- 3241 Chapel Downs DrFeb 20, 2026Re roof · 47 m away
- 3232 Chapel Downs DrDec 11, 2025Replacing water line from meter to house · 68 m away
- 3233 Chapel Downs DrMay 22, 2026Wire pool · 69 m away
- 3224 Chapel Downs DrMay 29, 2025Replace existing cast iron pipe up to bottom of the slab as deemed necessary.install schedule 40 pvc system for kitchen, laundry, and bathroom fixtures and repipe everything underground up to city sewer connection · 90 m away
- 3337 Walchard CtApr 22, 2026Electrical for new construction · 92 m away
- 3331 Timberview RdJan 21, 2026Install 12 piers · 108 m away
- 3245 Timberview RdJul 8, 2025Tub drain repair via tunnel · 108 m away
- 3217 Chapel Downs DrJun 19, 2026Replace hvac system with 4 ton goodman 14 seer economy horizontal gas full system; no duct work · 114 m away
- 3237 Timberview RdOct 21, 2026Sewer repipe, relocate water heater, remodel 1 stand up shower · 117 m away
- 3232 Timberview RdSep 17, 2025Replace building drains · 131 m away