3322 Galahad Dr
Dallas, TX 75229
Permits filed for a 13-by-28-foot in-ground pool and spa
Permits indicate a new 13-by-28-foot in-ground pool with a spa and equipment at 3322 Galahad Dr. The pool permit was filed March 3, 2026, followed by an electrical permit on March 22 and a gas-line permit for the pool heater on April 15.
Summarized from City of Dallas records · updated Apr 15, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 15, 2026
- since Mar 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 3322 Galahad Dr
What is being built at 3322 Galahad Dr in Dallas?
City of Dallas permits indicate a new in-ground swimming pool measuring 13 by 28 feet, with a spa and equipment.
Is there a new pool planned at 3322 Galahad Dr?
A residential pool permit filed March 3, 2026, describes a new in-ground pool with a spa and equipment.
When were permits filed for the pool at 3322 Galahad Dr?
The pool permit, RES-POOL-26-000095, was filed March 3, 2026. Electrical and gas-line permits followed on March 22 and April 15, 2026.
Will the pool at 3322 Galahad Dr have a heater?
A City of Dallas plumbing permit filed April 15, 2026, describes installing a gas line for a pool heater.
What electrical work is permitted for the pool at 3322 Galahad Dr?
Permit RES-ELC-26-001608, filed March 22, 2026, covers electrical wiring for the underground swimming pool and its equipment.
Also being built nearby
All of 75229- 3340 Galahad DrSep 14, 2026Replace 50 gal gas water heater in hall closet · 41 m away
- 3345 Galahad DrMay 20, 2026Cast iron sewer replacement · 51 m away
- 3353 Galahad DrSep 29, 2026Install plumbing systems for new house · 69 m away
- 3359 Galahad DrNov 22, 2020Replace water service · 83 m away
- 3335 Norcross LnMay 20, 2026Emergency service repair · 84 m away
- 3360 Galahad DrOct 27, 2020Gas relay or repair with test · 85 m away
- 3343 Norcross LnFeb 16, 2026Repairing gas leaks found in the home · 85 m away
- 3329 Norcross LnAug 29, 2025X install 31 total pilings (13 exterior, 18 breakouts).x install 10 angle irons.x adjust 5 existing pilings · 86 m away
- 3318 Lancelot DrJul 29, 2025Installation of hvac/ductwork · 96 m away
- 3334 Norcross LnNov 10, 2026Replacement and installation of approximately 25 feet of the existing underground sewer line. the location will be from the far back restroom to the new double clean outs in the front yard flower bed. complete rough in and top out for new powder room located in kitchen area near master bedroom will need to relocate approximately 10 ft of water lines to tie in the 2 new fixtures. replacing existing water heater with tankless water heater, and installing new gas line to gas oven · 97 m away
- 3342 Norcross LnJul 22, 20262 spot repairs in yard · 98 m away
- 3328 Norcross LnOct 13, 2025Install new electrical · 98 m away