3335 Norcross Ln
Dallas, TX 75229
Electrical repairs and a roof replacement at 3335 Norcross Ln
City of Dallas permits show electrical service repairs at 3335 Norcross Ln on May 20, 2026. Earlier permits recorded a roof replacement in December 2020 and foundation stabilization work in September 2020; the records do not indicate a new building.
Summarized from City of Dallas records · updated May 20, 2026
- Projects
- 4
- 4 filings
- Latest filing
- May 20, 2026
- since Dec 8, 2020
- Largest scope
- —
- Listed value
- $21K
- partial · often understated
Permit & project history
4 projectsSources: City of Dallas
Questions about 3335 Norcross Ln
What is being built at 3335 Norcross Ln?
The listed permits describe repairs and maintenance, not a new building. They include electrical service work in May 2026, a roof replacement in December 2020, and foundation stabilization in September 2020.
What electrical work was permitted at 3335 Norcross Ln?
Two City of Dallas residential electrical permits were filed on May 20, 2026. One describes emergency service repair; the other covers repairing a 200-amp overhead meter base and adding grounding and surge protection.
When was the roof replaced at 3335 Norcross Ln?
A City of Dallas permit dated December 8, 2020, describes removing the existing roof and installing a new roof. The permit number is 2012086013.
Was foundation work permitted at 3335 Norcross Ln?
Yes. A September 9, 2020, permit describes installing 11 concrete pilings and adjusting nine existing pilings to stabilize the property. The permit number is 2009081073.
Is a new commercial building planned at 3335 Norcross Ln?
The records provided do not show a new commercial building project. The listed permits are for residential electrical work, a roof replacement, and foundation stabilization.
Also being built nearby
All of 75229- 3334 Norcross LnNov 10, 2026Replacement and installation of approximately 25 feet of the existing underground sewer line. the location will be from the far back restroom to the new double clean outs in the front yard flower bed. complete rough in and top out for new powder room located in kitchen area near master bedroom will need to relocate approximately 10 ft of water lines to tie in the 2 new fixtures. replacing existing water heater with tankless water heater, and installing new gas line to gas oven · 13 m away
- 3329 Norcross LnAug 29, 2025X install 31 total pilings (13 exterior, 18 breakouts).x install 10 angle irons.x adjust 5 existing pilings · 15 m away
- 3328 Norcross LnOct 13, 2025Install new electrical · 20 m away
- 3343 Norcross LnFeb 16, 2026Repairing gas leaks found in the home · 21 m away
- 3342 Norcross LnJul 22, 20262 spot repairs in yard · 24 m away
- 3320 Norcross LnApr 16, 2026Upgrade service with grounding and surge protection · 38 m away
- 3314 Norcross LnJun 18, 2025Repairing sewer line under the powder room by breaking through slab from the back in the garage. fixing the sewer line under second bathroom by tunneling from the side of the house about 6ft. changing the clay sewer pipe by trenching the front yard from the house to the side walk · 53 m away
- 3306 Norcross LnJul 13, 2026Remover shingle roof and replace with ct landmark shingles · 73 m away
- 3322 Galahad DrApr 15, 2026Install gas line for pool heater · 84 m away
- 3340 Galahad DrSep 14, 2026Replace 50 gal gas water heater in hall closet · 95 m away
- 3345 Galahad DrMay 20, 2026Cast iron sewer replacement · 110 m away
- 3353 Galahad DrSep 29, 2026Install plumbing systems for new house · 120 m away