3320 Norcross Ln
Dallas, TX 75229
Home repairs and system upgrades at 3320 Norcross Ln
City of Dallas permits show residential repairs and upgrades at 3320 Norcross Ln, including plumbing work, a roof replacement and an electrical service upgrade. The plumbing permit was filed February 20, 2026, the roofing permit March 9, and the electrical permit April 16.
Summarized from City of Dallas records · updated Apr 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 16, 2026
- since Feb 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 3320 Norcross Ln
What is being built at 3320 Norcross Ln?
The records show repairs and upgrades to a residence, not a new building. Permitted work includes replacing part of the plumbing, replacing the roof and upgrading the electrical service.
What work was permitted at 3320 Norcross Ln in 2026?
Dallas records list three residential permits: plumbing work filed February 20, 2026; roofing work filed March 9; and an electrical service upgrade filed April 16.
Is a new house being built at 3320 Norcross Ln?
The available permits describe work at an existing residence, including roof replacement, plumbing replacement and an electrical service upgrade. They do not describe new home construction.
What does the plumbing permit at 3320 Norcross Ln cover?
Permit RES-PLM-26-001958, filed February 20, 2026, describes replacing approximately 20 feet of cast iron.
What electrical work is planned at 3320 Norcross Ln?
Permit RES-ELC-26-002171, filed April 16, 2026, describes upgrading the electrical service with grounding and surge protection.
Is the roof being replaced at 3320 Norcross Ln?
A residential roofing permit filed March 9, 2026, describes removing and replacing the roof. The permit number is RES-ROOF-26-000310.
Also being built nearby
All of 75229- 3314 Norcross LnJun 18, 2025Repairing sewer line under the powder room by breaking through slab from the back in the garage. fixing the sewer line under second bathroom by tunneling from the side of the house about 6ft. changing the clay sewer pipe by trenching the front yard from the house to the side walk · 15 m away
- 3328 Norcross LnOct 13, 2025Install new electrical · 21 m away
- 3329 Norcross LnAug 29, 2025X install 31 total pilings (13 exterior, 18 breakouts).x install 10 angle irons.x adjust 5 existing pilings · 24 m away
- 3334 Norcross LnNov 10, 2026Replacement and installation of approximately 25 feet of the existing underground sewer line. the location will be from the far back restroom to the new double clean outs in the front yard flower bed. complete rough in and top out for new powder room located in kitchen area near master bedroom will need to relocate approximately 10 ft of water lines to tie in the 2 new fixtures. replacing existing water heater with tankless water heater, and installing new gas line to gas oven · 36 m away
- 3306 Norcross LnJul 13, 2026Remover shingle roof and replace with ct landmark shingles · 36 m away
- 3335 Norcross LnMay 20, 2026Emergency service repair · 38 m away
- 3342 Norcross LnJul 22, 20262 spot repairs in yard · 57 m away
- 3343 Norcross LnFeb 16, 2026Repairing gas leaks found in the home · 58 m away
- 3307 Darbyshire DrSep 21, 2026Electrical service repairs/ upgrade · 93 m away
- 3322 Galahad DrApr 15, 2026Install gas line for pool heater · 105 m away
- 3306 Darbyshire DrApr 22, 2026Relocation and panel replacement · 105 m away
- 3340 Galahad DrSep 14, 2026Replace 50 gal gas water heater in hall closet · 126 m away