3507 Flaxley Dr
Dallas, TX 75229
3507 Flaxley Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 3507 Flaxley Dr, Dallas, TX 75229. The most recent, filed October 13, 2020, covers: “Gas test”.
Compiled from City of Dallas records · updated Oct 13, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 13, 2020
- since Oct 13, 2020
- Largest scope
- —
- Listed value
- $6
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 3507 Flaxley Dr
What is being built at 3507 Flaxley Dr?
The latest filing (City of Dallas permit 2010136029, October 13, 2020) covers gas test.
How many permits and filings does 3507 Flaxley Dr have?
1 filing across 1 project, from October 13, 2020 to October 13, 2020.
How much is the construction at 3507 Flaxley Dr worth?
Permits at this address list about $6 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 3507 Flaxley Dr?
Yes. Nearby filings include 3514 Flaxley Dr (rsvp-new construction single family residence, Sep 11, 2026); 10307 Cromwell Dr (demolition of single-family home approx. 1,800 sq ft removing all existing slab, Nov 17, 2026); 10339 Cromwell Dr (install new hvac system and duct work, Mar 5, 2026).
How do I get alerts for new permits at 3507 Flaxley Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75229- 3514 Flaxley DrSep 11, 2026Rsvp-new construction single family residence · 30 m away
- 10307 Cromwell DrNov 17, 2026Demolition of single-family home approx. 1,800 sq ft removing all existing slab · 33 m away
- 10339 Cromwell DrMar 5, 2026Install new hvac system and duct work · 60 m away
- 3529 Flaxley DrOct 15, 2026Replace 2 ton gas hvac unit · 72 m away
- 3528 Flaxley DrJun 17, 2026Install 8' wooden fence · 75 m away
- 10211 Cromwell DrJun 5, 2025Replace sewer line · 110 m away
- 3549 Timberview RdSep 22, 2025Replace cast iron under bathroom · 111 m away
- 3543 Timberview RdOct 6, 2026Replace whole kitchen drain & sewer line, 5 ft tunnel · 112 m away
- 3531 Timberview RdAug 31, 2026New install two 5 ton of gas system · 116 m away
- 3519 Timberview RdAug 19, 2026Provide and install electrical sub panel to stand alone new garage. provide and install 1 1/2" pvc to new slab for 125 amp service. provide and install ufer ground to new slab to new garage addition. provide and install first means of disconnect with grounding and bonding to the outside of building per code. provide and install a few miscellaneous plugs and lights with gfi and arc fault breaker protection as needed · 118 m away
- 3544 Timberview RdSep 4, 2026Nsfaa-construction of a new custom single-family residence, including foundation, framing, roofing, exterior finishes, interior build-out, plumbing, electrical, mechanical/hvac systems, and associated site improvements, in accordance with approved construction plans and applicable codes · 124 m away
- 3516 Timberview RdSep 14, 2026Hot water slab leak repair, tunnel · 130 m away