3514 Flaxley Dr
Dallas, TX 75229
New single-family home planned at 3514 Flaxley Dr
Dallas permits indicate a single-family home is planned at 3514 Flaxley Dr after the existing house, foundation, garage and driveway are demolished. The demolition permit was filed September 3, 2026, and the new construction permit was filed September 11, 2026.
Summarized from City of Dallas records · updated Sep 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 11, 2026
- since Sep 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 3514 Flaxley Dr
What is being built at 3514 Flaxley Dr?
A Dallas permit describes new construction of a single-family residence. A separate permit covers demolition of the existing house, foundation, garage and driveway.
When was the new home permitted at 3514 Flaxley Dr?
The new construction permit, RES-NEW-26-001537, was filed September 11, 2026.
Is the existing house at 3514 Flaxley Dr being demolished?
A demolition permit, RES-DEM-26-000837, was filed September 3, 2026. It describes demolition of the house, foundation, garage and driveway to clear the lot.
How many homes are planned at 3514 Flaxley Dr?
The permit record describes construction of a single-family residence.
Who is building the new home at 3514 Flaxley Dr?
The permit records provided do not name an owner or builder.
What is the project cost for 3514 Flaxley Dr?
The records provided do not include a project cost or reported valuation.
Also being built nearby
All of 75229- 3507 Flaxley DrOct 13, 2020Gas test · 30 m away
- 3528 Flaxley DrJun 17, 2026Install 8' wooden fence · 50 m away
- 3529 Flaxley DrOct 15, 2026Replace 2 ton gas hvac unit · 51 m away
- 10307 Cromwell DrNov 17, 2026Demolition of single-family home approx. 1,800 sq ft removing all existing slab · 64 m away
- 10339 Cromwell DrMar 5, 2026Install new hvac system and duct work · 85 m away
- 3549 Timberview RdSep 22, 2025Replace cast iron under bathroom · 86 m away
- 3543 Timberview RdOct 6, 2026Replace whole kitchen drain & sewer line, 5 ft tunnel · 89 m away
- 3531 Timberview RdAug 31, 2026New install two 5 ton of gas system · 98 m away
- 3544 Timberview RdSep 4, 2026Nsfaa-construction of a new custom single-family residence, including foundation, framing, roofing, exterior finishes, interior build-out, plumbing, electrical, mechanical/hvac systems, and associated site improvements, in accordance with approved construction plans and applicable codes · 100 m away
- 3519 Timberview RdAug 19, 2026Provide and install electrical sub panel to stand alone new garage. provide and install 1 1/2" pvc to new slab for 125 amp service. provide and install ufer ground to new slab to new garage addition. provide and install first means of disconnect with grounding and bonding to the outside of building per code. provide and install a few miscellaneous plugs and lights with gfi and arc fault breaker protection as needed · 104 m away
- 10211 Cromwell DrJun 5, 2025Replace sewer line · 111 m away
- 3520 Timberview RdJun 9, 2025Service release no work per oncor · 116 m away