7307 Fieldgate Dr
Dallas, TX 75230
7307 Fieldgate Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7307 Fieldgate Dr, Dallas, TX 75230. The most recent, filed November 11, 2020, covers: “Sewer relay”.
Compiled from City of Dallas records · updated Nov 11, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2020
- since Nov 11, 2020
- Largest scope
- —
- Listed value
- $15
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 7307 Fieldgate Dr
What is being built at 7307 Fieldgate Dr?
The latest filing (City of Dallas permit 2011113022, November 11, 2020) covers sewer relay.
How many permits and filings does 7307 Fieldgate Dr have?
1 filing across 1 project, from November 11, 2020 to November 11, 2020.
How much is the construction at 7307 Fieldgate Dr worth?
Permits at this address list about $15 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 7307 Fieldgate Dr?
Yes. Nearby filings include 7317 Fieldgate Dr (electric on pool, Feb 18, 2026); 7336 Fieldgate Dr (install 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube, Sep 11, 2025); 7337 Fieldgate Dr (repipe remaining cast iron under crawl space for right side of the homewe will be connecting back into existing pvc branch line off kitchen , washer and 1/2 bathroom and middle bathroomwe will replace all remaining cast iron main up to front and master toilet. we will pull master and front toilet and install new pvc flanges and reset toilets with new wax ringsall pvc under home will be strapped and supported ro floor joist to maintain proper slope strapping will be spaced every 3-4 feetwe will need to dig single access in front where hub drain is located for access under home we will install two way cleanout in front flower bed where sewer main exits the home -repipe sewer main from house city easement by re routing line around large tree to city easement-have underground utilities located if needed and obtain a city permit. excavate from the house to the utility easement and expose the existing sewer and city riser if applicable. cut out the existing sewer line and then precision grade trench for proper slope. connect at the main trunk line where it exits the house and install a new schedule 40 pvc sewer and connect to the city riser if applicable. install 4” scheduled 40 two way pvc clean-outs, Sep 15, 2025).
How do I get alerts for new permits at 7307 Fieldgate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75230- 7317 Fieldgate DrFeb 18, 2026Electric on pool · 38 m away
- 7336 Fieldgate DrSep 11, 2025Install 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube · 83 m away
- 7337 Fieldgate DrSep 15, 2025Repipe remaining cast iron under crawl space for right side of the homewe will be connecting back into existing pvc branch line off kitchen , washer and 1/2 bathroom and middle bathroomwe will replace all remaining cast iron main up to front and master toilet. we will pull master and front toilet and install new pvc flanges and reset toilets with new wax ringsall pvc under home will be strapped and supported ro floor joist to maintain proper slope strapping will be spaced every 3-4 feetwe will need to dig single access in front where hub drain is located for access under home we will install two way cleanout in front flower bed where sewer main exits the home -repipe sewer main from house city easement by re routing line around large tree to city easement-have underground utilities located if needed and obtain a city permit. excavate from the house to the utility easement and expose the existing sewer and city riser if applicable. cut out the existing sewer line and then precision grade trench for proper slope. connect at the main trunk line where it exits the house and install a new schedule 40 pvc sewer and connect to the city riser if applicable. install 4” scheduled 40 two way pvc clean-outs · 88 m away
- 7349 Fieldgate DrJul 28, 20262.5 ton heat pump condenser change-out in right side yard & 100k btus air handler change-out in attic · 125 m away
- 4 Queensview CtJun 7, 2025Replaced water line · 137 m away
- 7344 Blairview DrDec 31, 2020Install swimming pool · 138 m away
- 7330 Blairview DrOct 7, 2025Installing a new gas line to a generator · 140 m away
- 1 Queensview CtNov 6, 2025Reroof__ gaf 40 year warranty timberline hdz shingles only · 145 m away
- 7322 Blairview DrJun 15, 2026Repair 15’ foot section of piping and install new pvc drain line · 150 m away
- 7345 Blairview DrMar 3, 2026Replace existing shingles and roll roofing on the home with like kind. we are not removing any roof decking. we are only removing the old existing shingles and roll roofing materials and replacing with like kind materials · 150 m away
- 9600 Boedeker StNov 4, 2026This is a renovation project involving the removal and replacement of the existing perimeter wall and fencing surrounding portions of the glen lakes homeowners association community, located on association common area and easement corridors fronting walnut hill lane and boedeker drive in dallas, texas. the existing wall and fencing, original to the development, are being replaced due to deterioration of masonry and steel components · 163 m away
- 7363 Blairview DrAug 10, 2026Tear off and replace one roof. haul away debris · 169 m away