groundranger
Historic · latest filing Nov 2020Commercial

7307 Fieldgate Dr

Dallas, TX 75230

7307 Fieldgate Dr: 1 project on record

City of Dallas lists 1 filing across 1 project at 7307 Fieldgate Dr, Dallas, TX 75230. The most recent, filed November 11, 2020, covers: “Sewer relay”.

Compiled from City of Dallas records · updated Nov 11, 2020

Projects
1
1 filings
Latest filing
Nov 11, 2020
since Nov 11, 2020
Largest scope
—
Listed value
$15
partial · often understated

Permit & project history

1 project
  1. Sewer relay

    Sewer relay

    City of Dallas permitPlumbing (PL) Single Family Alteration$15
    Record
    2011113022
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 7307 Fieldgate Dr

What is being built at 7307 Fieldgate Dr?

The latest filing (City of Dallas permit 2011113022, November 11, 2020) covers sewer relay.

How many permits and filings does 7307 Fieldgate Dr have?

1 filing across 1 project, from November 11, 2020 to November 11, 2020.

How much is the construction at 7307 Fieldgate Dr worth?

Permits at this address list about $15 in valuations. Permit valuations are often partial and understate total project cost.

Is there other construction near 7307 Fieldgate Dr?

Yes. Nearby filings include 7317 Fieldgate Dr (electric on pool, Feb 18, 2026); 7336 Fieldgate Dr (install 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube, Sep 11, 2025); 7337 Fieldgate Dr (repipe remaining cast iron under crawl space for right side of the homewe will be connecting back into existing pvc branch line off kitchen , washer and 1/2 bathroom and middle bathroomwe will replace all remaining cast iron main up to front and master toilet. we will pull master and front toilet and install new pvc flanges and reset toilets with new wax ringsall pvc under home will be strapped and supported ro floor joist to maintain proper slope strapping will be spaced every 3-4 feetwe will need to dig single access in front where hub drain is located for access under home we will install two way cleanout in front flower bed where sewer main exits the home -repipe sewer main from house city easement by re routing line around large tree to city easement-have underground utilities located if needed and obtain a city permit. excavate from the house to the utility easement and expose the existing sewer and city riser if applicable. cut out the existing sewer line and then precision grade trench for proper slope. connect at the main trunk line where it exits the house and install a new schedule 40 pvc sewer and connect to the city riser if applicable. install 4” scheduled 40 two way pvc clean-outs, Sep 15, 2025).

How do I get alerts for new permits at 7307 Fieldgate Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75230
Get alerts for 7307 Fieldgate Dr