7336 Fieldgate Dr
Dallas, TX 75230
7336 Fieldgate Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7336 Fieldgate Dr, Dallas, TX 75230. The most recent, filed September 11, 2025, covers: “Install 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube”.
Compiled from City of Dallas records · updated Sep 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 11, 2025
- since Sep 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube
Install 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 7336 Fieldgate Dr
What is being built at 7336 Fieldgate Dr?
The latest filing (City of Dallas permit RES-FDN-25-000453, September 11, 2025) covers install 8 total pilings, 943.7 reset/reshim, 24lf beam replacement-quadrupled, (2) 24x24x24 spread footing with sonotube.
How many permits and filings does 7336 Fieldgate Dr have?
1 filing across 1 project, from September 11, 2025 to September 11, 2025.
Is there other construction near 7336 Fieldgate Dr?
Yes. Nearby filings include 7337 Fieldgate Dr (repipe remaining cast iron under crawl space for right side of the homewe will be connecting back into existing pvc branch line off kitchen , washer and 1/2 bathroom and middle bathroomwe will replace all remaining cast iron main up to front and master toilet. we will pull master and front toilet and install new pvc flanges and reset toilets with new wax ringsall pvc under home will be strapped and supported ro floor joist to maintain proper slope strapping will be spaced every 3-4 feetwe will need to dig single access in front where hub drain is located for access under home we will install two way cleanout in front flower bed where sewer main exits the home -repipe sewer main from house city easement by re routing line around large tree to city easement-have underground utilities located if needed and obtain a city permit. excavate from the house to the utility easement and expose the existing sewer and city riser if applicable. cut out the existing sewer line and then precision grade trench for proper slope. connect at the main trunk line where it exits the house and install a new schedule 40 pvc sewer and connect to the city riser if applicable. install 4” scheduled 40 two way pvc clean-outs, Sep 15, 2025); 7349 Fieldgate Dr (2.5 ton heat pump condenser change-out in right side yard & 100k btus air handler change-out in attic, Jul 28, 2026); 7317 Fieldgate Dr (electric on pool, Feb 18, 2026).
How do I get alerts for new permits at 7336 Fieldgate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75230- 7337 Fieldgate DrSep 15, 2025Repipe remaining cast iron under crawl space for right side of the homewe will be connecting back into existing pvc branch line off kitchen , washer and 1/2 bathroom and middle bathroomwe will replace all remaining cast iron main up to front and master toilet. we will pull master and front toilet and install new pvc flanges and reset toilets with new wax ringsall pvc under home will be strapped and supported ro floor joist to maintain proper slope strapping will be spaced every 3-4 feetwe will need to dig single access in front where hub drain is located for access under home we will install two way cleanout in front flower bed where sewer main exits the home -repipe sewer main from house city easement by re routing line around large tree to city easement-have underground utilities located if needed and obtain a city permit. excavate from the house to the utility easement and expose the existing sewer and city riser if applicable. cut out the existing sewer line and then precision grade trench for proper slope. connect at the main trunk line where it exits the house and install a new schedule 40 pvc sewer and connect to the city riser if applicable. install 4” scheduled 40 two way pvc clean-outs · 13 m away
- 7349 Fieldgate DrJul 28, 20262.5 ton heat pump condenser change-out in right side yard & 100k btus air handler change-out in attic · 42 m away
- 7317 Fieldgate DrFeb 18, 2026Electric on pool · 70 m away
- 7307 Fieldgate DrNov 11, 2020Sewer relay · 83 m away
- 7365 Fieldgate DrAug 19, 2026Install 10 pilings; adjust existing pilings · 94 m away
- 7344 Blairview DrDec 31, 2020Install swimming pool · 106 m away
- 7363 Blairview DrAug 10, 2026Tear off and replace one roof. haul away debris · 116 m away
- 7345 Blairview DrMar 3, 2026Replace existing shingles and roll roofing on the home with like kind. we are not removing any roof decking. we are only removing the old existing shingles and roll roofing materials and replacing with like kind materials · 118 m away
- 7374 Fieldgate DrApr 8, 2026Replace existing hvac for the main unit and bedroom unit · 120 m away
- 7381 Blairview DrJan 11, 2021Replace or modify existing hvac · 128 m away
- 7330 Blairview DrOct 7, 2025Installing a new gas line to a generator · 129 m away
- 7387 Blairview DrJun 23, 2026Install an 8' wooden fence · 135 m away