6941 Kingsbury Dr
Dallas, TX 75231
Home solar and plumbing work permitted on Kingsbury Drive
Permits at 6941 Kingsbury Dr cover a 15-module, 6.15-kilowatt roof-mounted solar system and replacement of cast-iron plumbing under the home. The solar permits were filed September 17, 2025, and the plumbing permit was filed April 9, 2026.
Summarized from City of Dallas records · updated Apr 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 9, 2026
- since Sep 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 6941 Kingsbury Dr
What work is permitted at 6941 Kingsbury Dr?
City of Dallas permits cover a roof-mounted solar system and replacement of cast-iron plumbing under the home. The solar permits were filed September 17, 2025, and the plumbing permit was filed April 9, 2026.
Is a new home being built at 6941 Kingsbury Dr?
The records provided do not show a new-home permit. They show residential solar and plumbing work at the address.
What kind of solar system is planned for 6941 Kingsbury Dr?
The permit description specifies 15 roof-mounted solar modules with a 6.15-kilowatt capacity. The solar permit, RES-SOLAR-25-000322, was filed September 17, 2025.
What plumbing work is planned at 6941 Kingsbury Dr?
A City of Dallas residential plumbing permit describes replacing cast iron under the home. Permit RES-PLM-26-003770 was filed April 9, 2026.
When were permits filed for work at 6941 Kingsbury Dr?
The solar and electrical permits were filed September 17, 2025. The plumbing permit followed on April 9, 2026.
How many solar panels are planned at 6941 Kingsbury Dr?
The permit description calls for 15 roof-mounted modules in a 6.15-kilowatt system. The solar permit was filed September 17, 2025.
Also being built nearby
All of 75231- 6935 Kingsbury DrAug 24, 2026Re-roof home - no structural changes will be made. the current roofing system will be removed to the deck. if there are any issues in the deck, we'll repair them. like materials and color will be reinstalled · 8 m away
- 6953 Kingsbury DrDec 1, 2020Replace or modify existing hvac · 16 m away
- 6929 Kingsbury DrJul 14, 2026Move water line in wall 6-8" and install new shower valve · 16 m away
- 6911 Kingsbury DrOct 5, 2026Replace 4.0 ton system with a 4.0 ton system · 41 m away
- 6930 Kingsbury DrOct 30, 2025Water heater install · 68 m away
- 6409 Larmanda StAug 3, 2026Tear out only marked in yellow install new 8' tall cedar board on board marked in red along side and back of property post set 24" deep in concrete and at 6' centers no gates · 78 m away
- 6912 Kingsbury DrOct 22, 2025Install 14 concrete pilings to stabilize foundation · 107 m away
- 7009 Kingsbury DrAug 5, 2025Replaced federal pacific panel & disconnect with up to code electrical panel · 109 m away
- 6925 Winchester StSep 19, 2020Remove existing roof and install new roof · 129 m away
- 7023 Kingsbury DrAug 31, 2026Complete electrical service change for both dwelling units of a two-family duplex at 7021 and 7023 kingsbury dr. each unit is currently served by a 150 amp fused service with a federal pacific stab-lok load center located in a clothes closet. the scope below is performed twice, once per dwelling unit.service, 2 required: remove the existing fused service disconnect and obsolete meter socket at each unit. install two new service masts of 2 inch rigid metal conduit with weatherhead, point of attachment hardware, and roof flashing, connected to the existing overhead service drop. install new 2/0 copper service entrance conductors, three conductors per unit. install two new 200 amp ringless meter-main combinations (square d rc200s with 200 amp main breaker), one per unit, on the exterior rear wall, each set within the utility required meter height and each serving as the service disconnecting means for its own unit. each marked per nec 230.85. each meter socket permanently identified with its unit address per utility requirements for multi-metered locations.load centers, 2 required: remove both existing federal pacific stab-lok load centers from clothes closets. install two new 42 space main lug load centers, 225 amp bus, one per unit, at code compliant locations. each supplied by a 200 amp feeder of 4/0 aluminum ser, approximately 60 feet per unit, from that unit's service disconnect. each existing panel enclosure to be retained as an accessible junction box with blank cover. existing branch circuits to be spliced and extended to the new load center, then identified and labeled with a circuit directory per nec 408.4(a). approximately 18 branch circuits per unit.grounding and bonding, 2 required: new grounding electrode system at each unit consisting of two 8 foot driven ground rods, #4 bare copper grounding electrode conductor sized per nec 250.66, water pipe bond, and intersystem bonding termination. each load center neutral isolated from equipment ground per nec 250.24 and 250.142.other: install a whole panel surge protective device at each load center per nec 230.67. install branch circuit overcurrent devices. coordinate meter removal and reset with oncor for both meters.existing branch circuit conductors remain in place. no branch circuit rewiring is included in this scope · 136 m away
- 6926 Winchester StSep 28, 2026Change sewer drains under house · 137 m away
- 6915 Winchester StOct 7, 2025We will be relocating and replacing the main electrical panel from inside the house to the new location outside. we will also be relocating service to the side wall · 141 m away
More solar installs in 75231.