6409 Larmanda St
Dallas, TX 75231
8-foot cedar fence planned at 6409 Larmanda St
A City of Dallas residential permit filed August 3, 2026, describes installing an 8-foot cedar board-on-board fence along the side and back of the property. The scope also calls for removing only the areas marked in yellow, setting posts 24 inches deep in concrete at 6-foot intervals, and installing no gates.
Summarized from City of Dallas records · updated Aug 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 3, 2026
- since Aug 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectTear out only marked in yellow install new 8' tall cedar board on board marked in red along side and back of property post set 24" deep in concrete and at 6' centers no gates
Tear out only marked in yellow install new 8' tall cedar board on board marked in red along side and back of property post set 24" deep in concrete and at 6' centers no gates
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 6409 Larmanda St
What is being built at 6409 Larmanda St?
A City of Dallas permit describes an 8-foot cedar board-on-board fence along the side and back of the property. The permit is RES-ACC-26-000945, filed August 3, 2026.
Is a new fence planned at 6409 Larmanda St?
Yes. The permit scope describes installing an 8-foot-tall cedar fence, with posts set 24 inches deep in concrete and spaced 6 feet apart.
When was the fence permit filed for 6409 Larmanda St?
The City of Dallas permit, RES-ACC-26-000945, was filed on August 3, 2026.
Will the fence at 6409 Larmanda St have a gate?
The permit description specifies no gates.
Which parts of the property are included in the fence work?
The permit describes the fence along the side and back of the property. It also says removal is limited to the areas marked in yellow.
Also being built nearby
All of 75231- 7009 Kingsbury DrAug 5, 2025Replaced federal pacific panel & disconnect with up to code electrical panel · 36 m away
- 7023 Kingsbury DrAug 31, 2026Complete electrical service change for both dwelling units of a two-family duplex at 7021 and 7023 kingsbury dr. each unit is currently served by a 150 amp fused service with a federal pacific stab-lok load center located in a clothes closet. the scope below is performed twice, once per dwelling unit.service, 2 required: remove the existing fused service disconnect and obsolete meter socket at each unit. install two new service masts of 2 inch rigid metal conduit with weatherhead, point of attachment hardware, and roof flashing, connected to the existing overhead service drop. install new 2/0 copper service entrance conductors, three conductors per unit. install two new 200 amp ringless meter-main combinations (square d rc200s with 200 amp main breaker), one per unit, on the exterior rear wall, each set within the utility required meter height and each serving as the service disconnecting means for its own unit. each marked per nec 230.85. each meter socket permanently identified with its unit address per utility requirements for multi-metered locations.load centers, 2 required: remove both existing federal pacific stab-lok load centers from clothes closets. install two new 42 space main lug load centers, 225 amp bus, one per unit, at code compliant locations. each supplied by a 200 amp feeder of 4/0 aluminum ser, approximately 60 feet per unit, from that unit's service disconnect. each existing panel enclosure to be retained as an accessible junction box with blank cover. existing branch circuits to be spliced and extended to the new load center, then identified and labeled with a circuit directory per nec 408.4(a). approximately 18 branch circuits per unit.grounding and bonding, 2 required: new grounding electrode system at each unit consisting of two 8 foot driven ground rods, #4 bare copper grounding electrode conductor sized per nec 250.66, water pipe bond, and intersystem bonding termination. each load center neutral isolated from equipment ground per nec 250.24 and 250.142.other: install a whole panel surge protective device at each load center per nec 230.67. install branch circuit overcurrent devices. coordinate meter removal and reset with oncor for both meters.existing branch circuit conductors remain in place. no branch circuit rewiring is included in this scope · 62 m away
- 6953 Kingsbury DrDec 1, 2020Replace or modify existing hvac · 62 m away
- 6941 Kingsbury DrApr 9, 2026Replacing cast iron under the home · 78 m away
- 6935 Kingsbury DrAug 24, 2026Re-roof home - no structural changes will be made. the current roofing system will be removed to the deck. if there are any issues in the deck, we'll repair them. like materials and color will be reinstalled · 86 m away
- 6929 Kingsbury DrJul 14, 2026Move water line in wall 6-8" and install new shower valve · 94 m away
- 7041 Kingsbury DrJun 2, 202614.3 seer upflow 2 ton gas system · 95 m away
- 6911 Kingsbury DrOct 5, 2026Replace 4.0 ton system with a 4.0 ton system · 119 m away
- 6930 Kingsbury DrOct 30, 2025Water heater install · 146 m away
- 7030 Winchester StJul 22, 2025Replace 2 ton complete · 151 m away
- 7043 Winchester StJan 26, 2021Remove existing roof and install new roof · 152 m away
- 7036 Winchester StNov 24, 2025Gas test · 157 m away