7036 Winchester St
Dallas, TX 75231
Gas test permitted at 7036 Winchester St
A residential plumbing permit for a gas test was filed at 7036 Winchester St on November 24, 2025. The City of Dallas record lists permit RES-PLM-25-007924 and does not specify additional work.
Summarized from City of Dallas records · updated Nov 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 24, 2025
- since Nov 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7036 Winchester St
What is being built at 7036 Winchester St in Dallas?
The City of Dallas record lists a residential plumbing permit for a gas test, filed November 24, 2025. It does not describe a new building.
What work was permitted at 7036 Winchester St?
The permit description is “Gas test.” The record does not provide further details about the work.
When was the gas test permit filed at 7036 Winchester St?
It was filed on November 24, 2025, under permit number RES-PLM-25-007924.
Is a new home being built at 7036 Winchester St?
The available City of Dallas record is for a residential plumbing gas test. It does not identify a new home construction project.
What is permit RES-PLM-25-007924 in Dallas?
It is a City of Dallas residential plumbing permit for a gas test at 7036 Winchester St, filed November 24, 2025.
Also being built nearby
All of 75231- 7030 Winchester StJul 22, 2025Replace 2 ton complete · 14 m away
- 7043 Winchester StJan 26, 2021Remove existing roof and install new roof · 18 m away
- 7055 Winchester StMay 22, 2025Install 4 total pilingsfoundation repair only, no layout changes allowed.all work subject to field inspector approval. foundation repair only, no layout changes allowed · 42 m away
- 7023 Wakefield StNov 3, 2020Plumbing (pl) single family alteration · 106 m away
- 7031 Wakefield StJul 8, 2026Replacing 4 ton gas complete system · 111 m away
- 7023 Kingsbury DrAug 31, 2026Complete electrical service change for both dwelling units of a two-family duplex at 7021 and 7023 kingsbury dr. each unit is currently served by a 150 amp fused service with a federal pacific stab-lok load center located in a clothes closet. the scope below is performed twice, once per dwelling unit.service, 2 required: remove the existing fused service disconnect and obsolete meter socket at each unit. install two new service masts of 2 inch rigid metal conduit with weatherhead, point of attachment hardware, and roof flashing, connected to the existing overhead service drop. install new 2/0 copper service entrance conductors, three conductors per unit. install two new 200 amp ringless meter-main combinations (square d rc200s with 200 amp main breaker), one per unit, on the exterior rear wall, each set within the utility required meter height and each serving as the service disconnecting means for its own unit. each marked per nec 230.85. each meter socket permanently identified with its unit address per utility requirements for multi-metered locations.load centers, 2 required: remove both existing federal pacific stab-lok load centers from clothes closets. install two new 42 space main lug load centers, 225 amp bus, one per unit, at code compliant locations. each supplied by a 200 amp feeder of 4/0 aluminum ser, approximately 60 feet per unit, from that unit's service disconnect. each existing panel enclosure to be retained as an accessible junction box with blank cover. existing branch circuits to be spliced and extended to the new load center, then identified and labeled with a circuit directory per nec 408.4(a). approximately 18 branch circuits per unit.grounding and bonding, 2 required: new grounding electrode system at each unit consisting of two 8 foot driven ground rods, #4 bare copper grounding electrode conductor sized per nec 250.66, water pipe bond, and intersystem bonding termination. each load center neutral isolated from equipment ground per nec 250.24 and 250.142.other: install a whole panel surge protective device at each load center per nec 230.67. install branch circuit overcurrent devices. coordinate meter removal and reset with oncor for both meters.existing branch circuit conductors remain in place. no branch circuit rewiring is included in this scope · 117 m away
- 7041 Kingsbury DrJun 2, 202614.3 seer upflow 2 ton gas system · 122 m away
- 7009 Kingsbury DrAug 5, 2025Replaced federal pacific panel & disconnect with up to code electrical panel · 128 m away
- 7049 Wakefield CirDec 18, 2020Addition to sfd · 137 m away
- 7053 Wakefield CirFeb 20, 2026Wooden fence install- this is for installing a 182 feet long x 8 feet tall wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim- includes 2x6x12 treated kick board along the base of the fence- includes installing 1 gate that are 42" wide.sliding e-gate furnish and install complete sliding e-gate system• liftmaster sliding gate operator (solar-compatible)• solar panel power kit with mounting hardware• heavy-duty v-track installation• reinforced concrete footer for operator, posts, and track• custom metal backing frame fabrication and installation• 4x4 steel post set in concrete• rubber rollers for smooth gate travel• all required brackets, hardware, and accessories• professional labor for full assembly, alignment, and testingadditional wooden fence install- includes demoing and hauling off existing fence that is 32' long.- this quote is for installing a 47 feet long x 8 feet tall board on board wooden fence.- includes digging post holes 3 feet deep. posts will be spaced 6 feet apart.- each post will be installed in maximizer concrete.- posts will be 11’ steel post (but only 8 feet will be above ground)- fence will be vertical. install 1x6x8 pre stained's vertically to build board on board fence- includes installing 2x6x12 pre stained's as a top cap for the fence- includes installing steel post caps on top of all the posts- includes 1x4x8 pre stained trim installed as double trim.- includes 2x6x12 treated kick board along the base of the fence stacked one high.- includes installing 1 gate that are 36" wide- prestained color is dark walnutwrought iron47' of additional fence to match the fence build and e-gate already signed for, new 4' tall wrought iron with one gate and new post and material · 138 m away
- 7042 Wakefield StJul 15, 2026Residential reroofremove current shingle layerreplace with new shingle layer · 141 m away
- 7061 Wakefield CirJan 6, 2026Gas test · 142 m away