1819 W Wheatland Rd
Dallas, TX 75232
David W. Carter High School addition and renovation
A City of Dallas permit filed February 26, 2026, describes an 8,000-square-foot attached addition at David W. Carter High School, including a dance room and black box, along with interior renovations. Later permits filed September 4 and 9, 2026, cover a new 310-foot gas line, regulator and shutoff valves.
Summarized from City of Dallas records · updated Sep 9, 2026
- Projects
- 25
- 25 filings
- Latest filing
- Sep 9, 2026
- since Jul 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
25 projectsDsst-disd - 23 david carter hs, addition and renovationnew attached addition (8,000sf). addition to include new dance room and black box. new mep and fire safety items. demolition of select flatwork and buildback.minor interior renovation of existing high school. areas to be affected will be corridors. new wall finishes, ceiling, and light fixtures. existing hvac, fire alarm and sprinklers to remain, they will be relocated and extended to new surfaces as needed
Dsst-disd - 23 david carter hs, addition and renovationnew attached addition (8,000sf). addition to include new dance room and black box. new mep and fire safety items. demolition of select flatwork and buildback.minor interior renovation of existing high school. areas to be affected will be corridors. new wall finishes, ceiling, and light fixtures. existing hvac, fire alarm and sprinklers to remain, they will be relocated and extended to new surfaces as needed
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1819 W Wheatland Rd
What is being built at 1819 W Wheatland Rd?
A permit filed February 26, 2026, describes an 8,000-square-foot attached addition at David W. Carter High School, with a dance room and black box. The permit also covers renovations to parts of the existing school.
Is a new school being built at 1819 W Wheatland Rd?
The records describe an addition and renovation at the existing David W. Carter High School, not a new school. The addition is listed as 8,000 square feet in permit COM-ALT-ADD-25-001276.
What rooms are included in the David W. Carter High School addition?
The February 26, 2026, permit describes a new dance room and black box in the attached addition.
What renovations are planned at David W. Carter High School?
The permit describes minor interior renovations in corridors, including new wall finishes, ceilings and light fixtures. It also lists an auditorium renovation in a mechanical permit filed October 13, 2025.
What work do the 2026 gas line permits cover at 1819 W Wheatland Rd?
Permits COM-PLM-26-003534 and COM-PLM-26-003555 describe installing 310 feet of new 4-inch gas line, a regulator and shutoff valves. They were filed September 4 and September 9, 2026.
Also being built nearby
All of 75232- 1819 Wheatland Road · Dallas ISDAug 20, 2024Disd - david w. carter hs black box addition — renovation/alteration — new 2-story 8,000 sq ft addition of a black box and dance studio to an existing high school, interior renovations to select spaces
- 1417 Marena Moore WayFeb 25, 2026We are replacing an electric water heater · 284 m away
- 1405 Marena Moore WayDec 11, 2025Water heater replacement · 287 m away
- 8047 Genesis DrJun 5, 20262.5 ton system · 386 m away
- 1347 Cleardale DrJun 6, 2025Install 50 gallon electric water heater in garage · 416 m away
- 1327 Cleardale DrNov 16, 2026Install remedial foundation piers to stabilize the existing slab foundation and improve structural performance · 440 m away
- 1402 Mill Stream DrOct 1, 2025200 amp panel and meter base replacement · 480 m away
- 2004 Algebra DrOct 15, 2025Excavate and install 24 exterior hybrid piers · 484 m away
- 2012 Algebra DrJul 20, 2026Hvac system with ductwork, exhaust fans, vent hood and dryer · 485 m away
- 1401 Mill Stream DrOct 28, 20263.5 ton base gas upflow system · 491 m away
- 8017 Alex David CirJul 29, 2026Rheem classic a2l - 3.0 ton up to 14.3 seer2 hp split sys - 2-stg cond · 501 m away
- 1806 Dolores WayMay 4, 2026Mcr with battery (3rd) danny kinder - installation of a grid tied, roof mounted, solar pv systems and sonnencore+ score-p20 20kwh batteries and an mdu with a 3rd party reviewed plan set · 510 m away