1819 Wheatland Road
Dallas, TX 75232 · Dallas ISD
David W. Carter High School black box and dance studio addition
A two-story, 8,000-square-foot black box and dance studio addition, with renovations to select spaces, was registered with TDLR on August 20, 2024, at David W. Carter High School. The applicant estimated the project cost at $6,336,476; its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 20, 2024
- since Aug 20, 2024
- Largest scope
- 8,000 sf
- Estimated cost
- $6.3M
- state registration
Where this project stands
Inspected · closing outDISD - David W. Carter HS Black Box Addition
8,000 sq ft · $6.3M est.
- RegisteredAug 20, 2024
- Plan review
- ConstructionJan '25 – Feb '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew 2-story 8,000 sq ft addition of a black box and dance studio to an existing high school, interior renovations to select spaces. — david w. carter high school
TDLR project registrationRenovation/AlterationInspection Complete8,000 sq ft$6.3M est.- Project #
- TABS2024025916
- Tenant / owner
- Disd - David W. Carter Hs Black Box Addition
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1819 Wheatland Road
What is being built at 1819 Wheatland Road in Dallas?
A two-story, 8,000-square-foot black box and dance studio addition at David W. Carter High School, along with renovations to select spaces. The TDLR registration is dated August 20, 2024.
Is a new school being built at 1819 Wheatland Road?
The filing describes an addition to the existing David W. Carter High School, not a new school. It includes a black box and dance studio.
How large is the David W. Carter High School addition?
The TDLR project registration lists the addition at 8,000 square feet and two stories.
When was the David W. Carter High School project registered?
The project was registered with the Texas Department of Licensing and Regulation on August 20, 2024.
What is the estimated cost of the David W. Carter High School addition?
The applicant's estimated project cost is $6,336,476, according to the TDLR registration.
Is the David W. Carter High School addition complete?
The TDLR record lists the project status as inspection complete.
Also being built nearby
All of 75232- 1819 W Wheatland RdSep 9, 2026Install 310lf of new 4,inch gas line regulator and shut off valves
- 1417 Marena Moore WayFeb 25, 2026We are replacing an electric water heater · 284 m away
- 1405 Marena Moore WayDec 11, 2025Water heater replacement · 287 m away
- 8047 Genesis DrJun 5, 20262.5 ton system · 386 m away
- 1347 Cleardale DrJun 6, 2025Install 50 gallon electric water heater in garage · 416 m away
- 1327 Cleardale DrNov 16, 2026Install remedial foundation piers to stabilize the existing slab foundation and improve structural performance · 440 m away
- 1402 Mill Stream DrOct 1, 2025200 amp panel and meter base replacement · 480 m away
- 2004 Algebra DrOct 15, 2025Excavate and install 24 exterior hybrid piers · 484 m away
- 2012 Algebra DrJul 20, 2026Hvac system with ductwork, exhaust fans, vent hood and dryer · 485 m away
- 1401 Mill Stream DrOct 28, 20263.5 ton base gas upflow system · 491 m away
- 8017 Alex David CirJul 29, 2026Rheem classic a2l - 3.0 ton up to 14.3 seer2 hp split sys - 2-stg cond · 501 m away
- 1806 Dolores WayMay 4, 2026Mcr with battery (3rd) danny kinder - installation of a grid tied, roof mounted, solar pv systems and sonnencore+ score-p20 20kwh batteries and an mdu with a 3rd party reviewed plan set · 510 m away