Prefabricated restroom building planned at 300 W Wheatland Rd
A prefabricated restroom building with utility hookups is planned at 300 W Wheatland Rd in Dallas. City of Dallas permits filed from Nov. 7 to Nov. 21, 2025, cover new construction, electrical service and plumbing work for the restroom.
Summarized from City of Dallas records · updated Nov 21, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Nov 21, 2025
- since Nov 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsInstalling feeder from existing panel to new restroom building. work is being done for the city of dallas parks department
Installing feeder from existing panel to new restroom building. work is being done for the city of dallas parks department
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 300 W Wheatland Rd
What is being built at 300 W Wheatland Rd?
A City of Dallas new-construction permit describes a prefabricated restroom building and utility hookups. The electrical permit says the work is for the City of Dallas Parks Department.
When were permits filed for the restroom building?
The new-construction permit, COM-NEW-25-000160, was filed Nov. 7, 2025. Electrical and plumbing permits followed on Nov. 18 and Nov. 21, 2025.
What plumbing is included at 300 W Wheatland Rd?
Permit COM-PLM-25-002784, filed Nov. 21, 2025, lists two toilets, two vanities, a drinking fountain, a backflow device, and sewer and water connections.
What electrical work is planned for the restroom?
Permit COM-ELC-25-003242, filed Nov. 18, 2025, covers installing a feeder from an existing panel to the new restroom building.
Is the new restroom building near Pa Plants Nursery?
Pa Plants Nursery, at 320 Pinnacle Dr, is listed about 454 meters from 300 W Wheatland Rd.
Is a new home being built at 300 W Wheatland Rd?
The City of Dallas permits describe a commercial prefabricated restroom building and utility hookups, not a new home.
Also being built nearby
All of 75232- 308 E Wheatland RdJul 2, 2026Relocate sewer main line, disconnect septic tank and connect the line in to tree city existing tap in front of the property. eliminate the septic tank · 6 m away
- 159 High Harvest RdApr 15, 2026Install 102 linear feet of 7ft tall cedar fence, including two walk gates, and 22 linear feet of 4ft tall iron fence · 101 m away
- 131 High Harvest RdAug 21, 2026Installing 9 total pilings (7 exterior, 2 exterior with concrete breakouts) · 143 m away
- 140 Idlewheat LnJan 30, 2026Mcr with battery installation of 8.2kw roof-mounted pv system with 20 modules, 1 inverter & 1 battery · 192 m away
- 7932 Arkan PkwyOct 6, 2025Roof replacement · 216 m away
- 131 Idlewheat LnMar 16, 2026Electrical work for residential addition/alteration · 217 m away
- 124 Idlewheat LnJun 10, 2026Replacing 3 ton heat pump complete system · 218 m away
- 156 Triumph RdNov 7, 2025Foundation repair-install 9 steel piers under the home to stabilize the foundation · 242 m away
- 8344 E Rl Thornton FreewayNov 5, 2024City credit union — renovation/alteration — build out 20,500 square feet of office space · 251 m away
- 111 Idlewheat LnApr 3, 2026Mcr installation of roof mounted solar panels · 251 m away
- 425 E Wheatland RdMar 9, 2026New single fam plumb sys · 263 m away
- 135 Triumph RdDec 16, 2020Install roofing mountage solar panels · 276 m away
More new homes in 75232.