Sewer connection and gas meter work at 308 E Wheatland Rd
Residential utility work at 308 E Wheatland Rd includes relocating a sewer main, disconnecting the septic tank and connecting to an existing tap. A City of Dallas permit for that work was filed July 2, 2026; an earlier permit filed September 26, 2025, covers relocating the gas meter.
Summarized from City of Dallas records · updated Jul 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 2, 2026
- since Sep 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsRelocate sewer main line, disconnect septic tank and connect the line in to tree city existing tap in front of the property. eliminate the septic tank
Relocate sewer main line, disconnect septic tank and connect the line in to tree city existing tap in front of the property. eliminate the septic tank
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 308 E Wheatland Rd
What is happening at 308 E Wheatland Rd?
City of Dallas permits show work to relocate a sewer main, disconnect the septic tank and connect to an existing tap. An earlier permit covers relocating the gas meter.
Is a new building being constructed at 308 E Wheatland Rd?
The available permits describe residential plumbing work, not construction of a new building.
When was the sewer work at 308 E Wheatland Rd permitted?
The sewer and septic work was filed on July 2, 2026, under permit RES-PLM-26-006836.
What is permit RES-PLM-26-006836 for?
The July 2, 2026, City of Dallas permit describes relocating a sewer main, disconnecting the septic tank and connecting to an existing tap.
Was gas meter work also permitted at this address?
Yes. Permit RES-PLM-25-005401, filed September 26, 2025, covers relocating the gas meter.
What's happening near Cityview on E Wheatland Road?
At 308 E Wheatland Rd, City of Dallas permits show residential sewer and septic work filed July 2, 2026, and gas meter work filed September 26, 2025.
Also being built nearby
All of 75241- 300 W Wheatland RdNov 21, 20252 toilets, 2 vanities, drinking fountain, 1 backflow, 1 sewer,1 water · 6 m away
- 159 High Harvest RdApr 15, 2026Install 102 linear feet of 7ft tall cedar fence, including two walk gates, and 22 linear feet of 4ft tall iron fence · 105 m away
- 131 High Harvest RdAug 21, 2026Installing 9 total pilings (7 exterior, 2 exterior with concrete breakouts) · 148 m away
- 140 Idlewheat LnJan 30, 2026Mcr with battery installation of 8.2kw roof-mounted pv system with 20 modules, 1 inverter & 1 battery · 196 m away
- 7932 Arkan PkwyOct 6, 2025Roof replacement · 216 m away
- 131 Idlewheat LnMar 16, 2026Electrical work for residential addition/alteration · 221 m away
- 124 Idlewheat LnJun 10, 2026Replacing 3 ton heat pump complete system · 222 m away
- 156 Triumph RdNov 7, 2025Foundation repair-install 9 steel piers under the home to stabilize the foundation · 245 m away
- 111 Idlewheat LnApr 3, 2026Mcr installation of roof mounted solar panels · 255 m away
- 8344 E Rl Thornton FreewayNov 5, 2024City credit union — renovation/alteration — build out 20,500 square feet of office space · 256 m away
- 425 E Wheatland RdMar 9, 2026New single fam plumb sys · 258 m away
- 135 Triumph RdDec 16, 2020Install roofing mountage solar panels · 279 m away