2925 Spruce Valley Ln
Dallas, TX 75233
Permits filed for new commercial buildings on Spruce Valley Lane
City of Dallas records indicate new commercial building construction at 2925 Spruce Valley Lane, with plumbing permits filed beginning June 11, 2025. Additional plumbing permits followed on July 2, and October permits cover commercial HVAC work for buildings 3 and 4. November permits cover new drive approaches and sidewalks along Spruce Valley Drive.
Summarized from City of Dallas records · updated Nov 20, 2025
- Projects
- 9
- 9 filings
- Latest filing
- Nov 20, 2025
- since Jun 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
9 projectsConstruction of new concrete drive approaches and sidewalks along spruce valley drive in accordance with city of dallas standards. workincludes removal of existing curb and gutter as required, installation of new concrete pavement, ada-compliant sidewalk sections, ramps, andtransitions to existing walkways. all work to comply with city of dallas right-of-way, grading, and accessibility requirements
Construction of new concrete drive approaches and sidewalks along spruce valley drive in accordance with city of dallas standards. workincludes removal of existing curb and gutter as required, installation of new concrete pavement, ada-compliant sidewalk sections, ramps, andtransitions to existing walkways. all work to comply with city of dallas right-of-way, grading, and accessibility requirements
City of Dallas permitCommercial Drive Approach and Sidewalk PermitConstruction of new concrete drive approaches and sidewalks along spruce valley drive in accordance with city of dallas standards. work includes removal of existing curb and gutter as required, installation of new concrete pavement, ada-compliant sidewalk sections, ramps, and transitions to existing walkways. all work to comply with city of dallas right-of-way, grading, and accessibility requirements
Construction of new concrete drive approaches and sidewalks along spruce valley drive in accordance with city of dallas standards. work includes removal of existing curb and gutter as required, installation of new concrete pavement, ada-compliant sidewalk sections, ramps, and transitions to existing walkways. all work to comply with city of dallas right-of-way, grading, and accessibility requirements
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 2925 Spruce Valley Ln
What is being built at 2925 Spruce Valley Lane?
City of Dallas permit descriptions indicate new commercial building construction. The records do not identify tenants or a specific business use.
When were permits filed for the project at 2925 Spruce Valley Lane?
The first listed permits were filed June 11, 2025, followed by a plumbing permit on July 2 and commercial HVAC permits on October 20, 2025.
What are the permit numbers for the new construction at 2925 Spruce Valley Lane?
Plumbing permits filed June 11 cite building permits 2404251018, 2404251019, 2404251020 and 2404251021. A July 2 plumbing permit cites permit 2404251022.
Are HVAC systems being installed at 2925 Spruce Valley Lane?
Commercial mechanical permits filed October 20, 2025, describe new HVAC work for buildings 3 and 4. They cite existing permits 2404251020 and 2404251021.
Are sidewalks or driveways part of the work at 2925 Spruce Valley Lane?
City records list permits for new concrete drive approaches and sidewalks along Spruce Valley Drive. The filings were dated November 6 and November 20, 2025.
Also being built nearby
All of 75233- 2961 Spruce Valley LnMay 29, 2026Remove and install 21sq 30year shingles. repair and replace any damaged plywood · 102 m away
- 2976 Clovis AveSep 26, 2025Gas test · 112 m away
- 2840 S Westmoreland RdJan 7, 2021Sewer relay · 246 m away
- 3316 Hansboro AveAug 28, 2026Remove concrete up in front of building on the side of front door for access. dig down to main water line and tunnel underneath slab to repair water leak. additional cost if pipe needs to be rerouted underneath beam. cut out bad section of pipe and replace with new section of pipe. all the way to the bathroom toilet needs to be replaced cast-iron and install new pvc sewer line · 286 m away
- 3326 Burgoyne StMay 11, 2026Rooftop boiler replacement · 296 m away
- 3015 Cliff Creek DrMar 26, 2026Replace yard gas line · 325 m away
- 3620 Alvarado StJan 13, 2021Ventilation (bathroom, dryer) · 345 m away
- 2972 Marideen AveJun 9, 2025Sewer relay · 348 m away
- 2822 El Tovar AveMay 14, 2026Nsfaa new single family dwelling · 349 m away
- 2971 Marideen AveOct 2, 2026Re-roof: no re-deck · 357 m away
- 3520 Tangle TerSep 8, 2025Gas test · 368 m away
- 3028 Cliff Creek DrJun 25, 2026Remove old roofing materials and replace with new roof system · 374 m away