2972 Marideen Ave
Dallas, TX 75233
2972 Marideen Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 2972 Marideen Ave, Dallas, TX 75233 since May 29, 2025. The most recent, filed June 9, 2025, covers: “Sewer relay”.
Compiled from City of Dallas records · updated Jun 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 9, 2025
- since May 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2972 Marideen Ave
What is being built at 2972 Marideen Ave?
The latest filing (City of Dallas permit RES-PLM-25-001201, June 9, 2025) covers sewer relay.
How many permits and filings does 2972 Marideen Ave have?
2 filings across 2 projects, from May 29, 2025 to June 9, 2025.
Is there other construction near 2972 Marideen Ave?
Yes. Nearby filings include 2971 Marideen Ave (re-roof: no re-deck, Oct 2, 2026); 3520 Tangle Ter (gas test, Sep 8, 2025); 3620 Alvarado St (ventilation (bathroom, dryer), Jan 13, 2021).
How do I get alerts for new permits at 2972 Marideen Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75233- 2971 Marideen AveOct 2, 2026Re-roof: no re-deck · 14 m away
- 3520 Tangle TerSep 8, 2025Gas test · 158 m away
- 3620 Alvarado StJan 13, 2021Ventilation (bathroom, dryer) · 222 m away
- 3021 El Tovar AveSep 28, 2026Full sewer repipe · 237 m away
- 2976 Clovis AveSep 26, 2025Gas test · 251 m away
- 3543 Creek View DrNov 3, 2026Underground gas line from meter to home gas riser · 261 m away
- 2940 Coombs Creek DrOct 29, 2026Installing new 3 phase 200 amp meter,replacing all interior receptacles · 289 m away
- 3040 El Tovar AveJul 29, 2026Technician returned to bring water heater up to code. removed t&p drain to condensate drain and capped off connection. re-plumbed flue pipe. installed new ball valve, flex line and leak breaker with a boiler drain on the drip pan. installed new temperature gas shutoff valve and repipe the gas line from the gas shutoff valve to the temperature shutoff valve to the gas control valve. installed new pressure relief valve in attic on hot water line and ran drain to exterior of the house on the right side · 317 m away
- 2961 Spruce Valley LnMay 29, 2026Remove and install 21sq 30year shingles. repair and replace any damaged plywood · 322 m away
- 3015 Cliff Creek DrMar 26, 2026Replace yard gas line · 326 m away
- 2925 Spruce Valley LnNov 20, 2025Construction of new concrete drive approaches and sidewalks along spruce valley drive in accordance with city of dallas standards. workincludes removal of existing curb and gutter as required, installation of new concrete pavement, ada-compliant sidewalk sections, ramps, andtransitions to existing walkways. all work to comply with city of dallas right-of-way, grading, and accessibility requirements · 348 m away
- 3816 Kiest Valley PkwySep 16, 2020Gas test · 348 m away