3536 Rio Grande Ave
Dallas, TX 75233
Gas test permit filed at 3536 Rio Grande Ave
A residential plumbing permit records a gas test for meter release at 3536 Rio Grande Ave. The City of Dallas permit was filed on October 8, 2026; the record does not describe new construction.
Summarized from City of Dallas records · updated Oct 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2026
- since Oct 8, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3536 Rio Grande Ave
What is happening at 3536 Rio Grande Ave in Dallas?
A City of Dallas residential plumbing permit records a gas test for meter release. It was filed on October 8, 2026.
Is a new house being built at 3536 Rio Grande Ave?
The available permit describes a gas test for meter release, not new home construction.
What permit was filed for 3536 Rio Grande Ave?
The City of Dallas issued record RES-PLM-26-010788, a residential plumbing permit for a gas test for meter release.
When was the permit filed at 3536 Rio Grande Ave?
The permit was filed on October 8, 2026.
Does the permit at 3536 Rio Grande Ave show a project cost?
No project valuation or estimated cost is listed in the permit record.
Also being built nearby
All of 75233- 3526 La Playa DrJun 21, 2025Install electric for addition · 78 m away
- 3549 Rio Grande CirJul 22, 2026120 new gas line and test · 109 m away
- 3803 Sam CirOct 12, 20263.5ton airhandler · 111 m away
- 3714 Blue Ridge BlvdOct 20, 2026Gas test with repairs to reinstate service · 159 m away
- 3611 Kimball Ridge DrAug 26, 2026Electric water heater replacement · 179 m away
- 3740 Kiestcrest DrApr 8, 2025Residential plumbing permit · 193 m away
- 3632 Kimball Ridge DrDec 17, 2020Remodel existing plumbing · 213 m away
- 3719 Kiestcrest DrJul 18, 2026Removal of existing hvac system and installation of new hvac system · 224 m away
- 3901 Blue Ridge BlvdNov 19, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, copper lineset, exhaust fan flex, ac drains, return air and supply boots) well as trim-out once interior is finished (grille out, setting condenser, start up). 4 ton straight cool hvac system, 15kw heat kit · 227 m away
- 3905 Blue Ridge BlvdApr 27, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, dryer lines, copper lineset, exhaust fan flex, ac drains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up).total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 235 m away
- 3909 Blue Ridge BlvdApr 24, 2026Hvac mechanicalnew construction work, which includes rough-in aspects such as (running ductwork,installation of air handler, dryer lines, copper lineset, exhaust fan flex, acdrains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up).total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 242 m away
- 3635 Blue Ridge BlvdOct 7, 2026Mcr with battery kracynthia gerald - installation of a grid tied, roof mounted, solar pv system with batteries with an mpu relocate · 247 m away