3901 Blue Ridge Blvd
Dallas, TX 75233
New 5-bedroom home permitted at 3901 Blue Ridge Blvd
A residential new-construction permit for a 5-bedroom, 4.5-bath home at 3901 Blue Ridge Blvd was filed on September 16, 2026. City of Dallas records also show electrical and plumbing permits for the new construction, filed September 17 and 21.
Summarized from City of Dallas records · updated Sep 21, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 21, 2026
- since Sep 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 3901 Blue Ridge Blvd
What is being built at 3901 Blue Ridge Blvd?
A City of Dallas permit describes new construction of a 5-bedroom, 4.5-bath home. The permit, RES-NEW-26-001629, was filed September 16, 2026.
How many bedrooms and bathrooms will the new home have?
The new-construction permit describes a home with 5 bedrooms and 4.5 bathrooms.
When was construction permitted at 3901 Blue Ridge Blvd?
The residential new-construction permit was filed September 16, 2026. Electrical and plumbing permits followed on September 17 and September 21.
Are there electrical and plumbing permits for the new home?
Yes. City records show an electrical permit, RES-ELC-26-005747, filed September 17, 2026, and a plumbing permit, RES-PLM-26-010066, filed September 21.
When will the home be completed?
The available permit records do not specify a completion date.
Also being built nearby
All of 75233- 3905 Blue Ridge BlvdApr 27, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, dryer lines, copper lineset, exhaust fan flex, ac drains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up).total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 8 m away
- 3909 Blue Ridge BlvdApr 24, 2026Hvac mechanicalnew construction work, which includes rough-in aspects such as (running ductwork,installation of air handler, dryer lines, copper lineset, exhaust fan flex, acdrains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up).total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 15 m away
- 3913 Blue Ridge BlvdMay 7, 2026Installation of the air conditioning and heating system · 23 m away
- 3921 Blue Ridge BlvdApr 23, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, dryer lines, copper lineset, exhaust fan flex, ac drains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up). total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 38 m away
- 3526 La Playa DrJun 21, 2025Install electric for addition · 153 m away
- 3803 Sam CirOct 12, 20263.5ton airhandler · 159 m away
- 4000 Blue Ridge BlvdJun 19, 2026Vestibule (other vestibule is really for the kitchen) · 201 m away
- 4000 Blue Ridge Road · Dallas Independent School DistrictDec 6, 2024277 thomas tolbert elementary school renovation — renovation/alteration — secure front vestibule, security additions, tile, exterior sealant replacement, repair/replace hvac, replace drinking fountains, replace grease-trap piping, fire-alarm system, exterior lighting, pa system · 201 m away
- 3539 Los Angeles BlvdApr 28, 2026Replacing existing sewer line for two full bathrooms includes one shower one bathtub, one sink the second includes one tub, toilet and one sink. the drainage line for the laundry area will be replaced and we will replace the sewer line leading to the city clean out and the drain line to the kitchen sink · 220 m away
- 3536 Rio Grande AveOct 8, 2026Gas test for meter release · 227 m away
- 3727 Wenatche DrOct 8, 2026Electrical work for new construction sfd · 242 m away
- 3733 Wenatche DrOct 8, 2026Electrical work for new sfd · 253 m away