4000 Blue Ridge Road
Dallas, TX 75233 · Dallas Independent School District
Thomas Tolbert Elementary renovation at 4000 Blue Ridge Road
A renovation of Thomas Tolbert Elementary School was registered with the Texas Department of Licensing and Regulation on December 6, 2024. The work covers security upgrades, HVAC repairs or replacement, a fire-alarm system, exterior lighting, tile and other repairs. The registration lists 82,000 square feet and an applicant-estimated project cost of $3.69 million; its status is Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 6, 2024
- since Dec 6, 2024
- Largest scope
- 82,000 sf
- Estimated cost
- $3.7M
- state registration
Where this project stands
Inspected · closing out277 Thomas Tolbert Elementary School Renovation
82,000 sq ft · $3.7M est.
- RegisteredDec 6, 2024
- Plan review
- ConstructionApr '25 – Jun '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSecure front vestibule, security additions, tile, exterior sealant replacement, repair/replace hvac, replace drinking fountains, replace grease-trap piping, fire-alarm system, exterior lighting, pa system — thomas tolbert elementary school
TDLR project registrationRenovation/AlterationInspection Complete82,000 sq ft$3.7M est.- Project #
- TABS2025007103
- Tenant / owner
- 277 Thomas Tolbert Elementary School Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4000 Blue Ridge Road
What is being built at 4000 Blue Ridge Road in Dallas?
The project is a renovation of Thomas Tolbert Elementary School, not a new building. The TDLR registration lists security additions, HVAC work, tile, exterior lighting and other upgrades.
When was the Thomas Tolbert Elementary renovation filed?
The TDLR project registration was filed December 6, 2024. Its project number is TABS2025007103.
How much will the Thomas Tolbert Elementary renovation cost?
The TDLR registration lists an applicant-estimated cost of $3.69 million. This is an estimate for the project, not a final cost.
What work is planned at Thomas Tolbert Elementary School?
The listed work includes a secure front vestibule, security additions, HVAC repairs or replacement, a fire-alarm system, exterior lighting, a PA system, drinking fountains and grease-trap piping.
Is the Thomas Tolbert Elementary renovation complete?
The TDLR record lists the project status as Inspection Complete. The registration was filed December 6, 2024.
What school project is happening near Palladium Cockrell Hill?
Thomas Tolbert Elementary School, at 4000 Blue Ridge Road, is undergoing a renovation. The TDLR registration dated December 6, 2024, lists 82,000 square feet of work.
Also being built nearby
All of 75233- 4000 Blue Ridge BlvdJun 19, 2026Vestibule (other vestibule is really for the kitchen)
- 3539 Los Angeles BlvdApr 28, 2026Replacing existing sewer line for two full bathrooms includes one shower one bathtub, one sink the second includes one tub, toilet and one sink. the drainage line for the laundry area will be replaced and we will replace the sewer line leading to the city clean out and the drain line to the kitchen sink · 102 m away
- 3921 Blue Ridge BlvdApr 23, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, dryer lines, copper lineset, exhaust fan flex, ac drains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up). total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 163 m away
- 3913 Blue Ridge BlvdMay 7, 2026Installation of the air conditioning and heating system · 178 m away
- 3909 Blue Ridge BlvdApr 24, 2026Hvac mechanicalnew construction work, which includes rough-in aspects such as (running ductwork,installation of air handler, dryer lines, copper lineset, exhaust fan flex, acdrains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up).total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 186 m away
- 3508 Hacienda DrJun 12, 2025Replace 3 ton gas hvac system · 189 m away
- 3905 Blue Ridge BlvdApr 27, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, dryer lines, copper lineset, exhaust fan flex, ac drains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up).total of (2) 2.5 ton heat pump hvac systems, 10kw heat kit · 194 m away
- 3901 Blue Ridge BlvdNov 19, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, copper lineset, exhaust fan flex, ac drains, return air and supply boots) well as trim-out once interior is finished (grille out, setting condenser, start up). 4 ton straight cool hvac system, 15kw heat kit · 201 m away
- 3505 Hacienda DrMay 22, 202550 gallon gas water heater in kitchen closet · 201 m away
- 3431 Los Angeles BlvdJun 26, 2026Gas test · 262 m away
- 4220 Blue Ridge BlvdOct 6, 2026Zo bc swimming pool for cockrell hill senior living · 267 m away
- 3406 Los Angeles BlvdOct 21, 2026Rsvp-demolition pending · 298 m away