12001 N. Central Expressway
Dallas, TX 75234 · Auk 12001 Ncx Partners LLC
Interior finish-out registered at 12001 N. Central Expressway
A 5,401-square-foot interior finish-out in an existing single-floor suite is planned at 12001 N. Central Expressway. The TDLR project registration was filed May 4, 2026, and lists HVAC, electrical and plumbing work. The applicant estimates the project cost at $325,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 4, 2026
- since May 4, 2026
- Largest scope
- 5,401 sf
- Estimated cost
- $325K
- state registration
Where this project stands
Finishing up · inspection nextAdvantis
5,401 sq ft · $325K est.
- RegisteredMay 4, 2026
- Plan review
- ConstructionMay '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 14, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectThe scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, plumbing. — 12001 ncx
TDLR project registrationRenovation/AlterationReview Complete5,401 sq ft$325K est.- Project #
- TABS2026019244
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 12001 N. Central Expressway
What is being built at 12001 N. Central Expressway?
A TDLR registration describes a non-structural interior finish-out in an existing single-floor suite. The listed scope includes HVAC, electrical and plumbing work.
When was the project at 12001 N. Central Expressway permitted?
The TDLR project registration, number TABS2026019244, was filed May 4, 2026. Its status is listed as Review Complete.
How large is the 12001 N. Central Expressway project?
The registered project area is 5,401 square feet.
How much will the finish-out at 12001 N. Central Expressway cost?
The applicant’s estimated project cost is $325,000. This is an estimate, not a confirmed final cost.
What is being built near Costco on Churchill Way?
A non-structural interior finish-out is registered at 12001 N. Central Expressway, about 203 meters from the Costco #1266 Dallas fuel facility. The scope lists HVAC, electrical and plumbing work.
Also being built nearby
All of 75234- 12001 N. Central Expressway · Auk 12001 Ncx Partners, LLCFeb 25, 2026Nowak and stauch — renovation/alteration — tenant improvement
- 12001 N Central ExpyJun 2, 2026Mcr interior remodelall work subject to field inspector approvalnon-load bearing walls only
- 12801 N Central ExpyOct 21, 2026Remodel of existing suite with mep · 133 m away
- 12655 N Central Expy · Costco Wholesale CorporationMay 29, 2025Replace 6" ductile iron domestic water line from exterior site valve box to mechanical room including the main booster pump located inside the mechanical room · 142 m away
- 12400 N Central ExpyOct 13, 2026Qteam meeting 12.15.2026 (all day)- new construction of a multi-family development with resident only amenities. mu-3 base zoning · 190 m away
- 8065 Churchill Way · Costco Wholesale CorporationSep 25, 2026Costco #1266 dallas - fuel facility generator addition — renovation/alteration — new generator on a new concrete pad with bollards and a new chain link fence enclosure at the existing fuel facility. includes electrical work and an electrical trench with pavement and landscape repair. no building work · 203 m away
- 8055 Churchill WayNov 13, 2025Addition of an exterior 9' x 9' restroom to an existing con · 218 m away
- 8055 Churchhill Way · Costco WholesaleOct 2, 2024Costco fleet restroom remodel - dallas — renovation/alteration — add new restoroom used for employees only onto existing retail building. exterior access for fleet delivery drivers after-hours. not for public use. minor site plan changes for construction of restrooms only · 218 m away
- 12411 N Central ExpyJul 7, 2026Meeting room / gym 5 ton basic sc electric system commercial replacement – unit #1– horizontal · 239 m away
- 12801 N Central Expy · Jpncp Iii,lpMar 12, 20261 plug, 1 data, 2 switches and 3 exits · 252 m away
- 12660 Coit RdNov 30, 2020Interior remodel only · 267 m away
- 12770 Coit RdSep 15, 2026Electrical validation on building permit no. com-alt-add-26-001972 · 298 m away