12801 N Central Expy
Dallas, TX 75251
Interior suite alterations permitted at 12801 N Central Expy
City of Dallas permits at 12801 N Central Expy cover interior suite remodeling, including new or relocated walls and mechanical, electrical, and plumbing work. Filings ran from July 27 to October 21, 2026.
Summarized from City of Dallas records · updated Oct 21, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Oct 21, 2026
- since Jul 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
13 projectsMcr build 2 demising walls. relocate door and sidelight. move electrical outlet. move exit sign, add exit sign. paint as required. relocate sprinkler head
Mcr build 2 demising walls. relocate door and sidelight. move electrical outlet. move exit sign, add exit sign. paint as required. relocate sprinkler head
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 12801 N Central Expy
What is being built at 12801 N Central Expy?
Dallas permit records describe interior suite alterations, including new walls, a demising wall, and mechanical, electrical, and plumbing work. They do not identify a tenant or a new building.
What work was permitted at 12801 N Central Expy in October 2026?
A permit filed October 21, 2026 (COM-ALT-ADD-26-002584), covers remodeling an existing suite with mechanical, electrical, and plumbing work. An October 15 permit (COM-ALT-ADD-26-002512) describes work in vacant space and a demising wall.
Are the permits for a new building or interior renovations?
The listed permits are commercial alteration and addition permits. Their descriptions refer to interior suite work and walls, rather than new building construction.
What changes do the 2026 permits mention?
The filings mention new or relocated walls, a cased opening, a moved door and sidelight, electrical outlet and exit-sign changes, and a relocated sprinkler head. The August 18 permit is COM-ALT-ADD-26-001669.
What work is planned near Costco #1266 in Dallas?
At 12801 N Central Expy, about 84 meters from Costco #1266, Dallas permits describe interior suite alterations. The Costco fuel-facility generator addition is a separate nearby project.
Also being built nearby
All of 75251- 8065 Churchill Way · Costco Wholesale CorporationSep 25, 2026Costco #1266 dallas - fuel facility generator addition — renovation/alteration — new generator on a new concrete pad with bollards and a new chain link fence enclosure at the existing fuel facility. includes electrical work and an electrical trench with pavement and landscape repair. no building work · 84 m away
- 12400 N Central ExpyOct 13, 2026Qteam meeting 12.15.2026 (all day)- new construction of a multi-family development with resident only amenities. mu-3 base zoning · 99 m away
- 8055 Churchill WayNov 13, 2025Addition of an exterior 9' x 9' restroom to an existing con · 104 m away
- 8055 Churchhill Way · Costco WholesaleOct 2, 2024Costco fleet restroom remodel - dallas — renovation/alteration — add new restoroom used for employees only onto existing retail building. exterior access for fleet delivery drivers after-hours. not for public use. minor site plan changes for construction of restrooms only · 104 m away
- 12411 N Central ExpyJul 7, 2026Meeting room / gym 5 ton basic sc electric system commercial replacement – unit #1– horizontal · 109 m away
- 12001 N. Central Expressway · Auk 12001 Ncx Partners LLCMay 4, 2026Advantis — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, plumbing · 133 m away
- 12001 N Central ExpyJun 2, 2026Mcr interior remodelall work subject to field inspector approvalnon-load bearing walls only · 133 m away
- 12001 N. Central Expressway · Auk 12001 Ncx Partners, LLCFeb 25, 2026Nowak and stauch — renovation/alteration — tenant improvement · 133 m away
- 12660 Coit RdNov 30, 2020Interior remodel only · 219 m away
- 12655 N Central Expy · Costco Wholesale CorporationMay 29, 2025Replace 6" ductile iron domestic water line from exterior site valve box to mechanical room including the main booster pump located inside the mechanical room · 257 m away
- 7900 Churchill WayMay 29, 2025Replace a 2" backflow device at building 8 · 268 m away
- 12228 North Central Expwy · Hatteras Pavilion II LLCNov 12, 2025Kelly schultz — new construction — interior finish out for medical office · 288 m away