5623 Mesa Cir
Dallas, TX 75235
Permits indicate a new duplex at 5623–5625 Mesa Cir
Dallas permits indicate a new duplex at 5623 and 5625 Mesa Cir, following a demolition permit filed October 1, 2025. New-construction and plumbing permits were filed October 28, 2025, with electrical work permitted January 16, 2026, and a new HVAC system permitted March 1, 2026.
Summarized from City of Dallas records · updated Mar 24, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Mar 24, 2026
- since Oct 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsThe fence height is 6'8 at the highest height for about 12 ft. wide one one side the below will not allow me to put height and inches so i rounded up to 7ft
The fence height is 6'8 at the highest height for about 12 ft. wide one one side the below will not allow me to put height and inches so i rounded up to 7ft
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 5623 Mesa Cir
What is being built at 5623 Mesa Cir?
Dallas permit records indicate a new duplex at 5623 and 5625 Mesa Cir. The new-construction permit, RES-NEW-25-001015, was filed October 28, 2025.
Was there a demolition at 5623 Mesa Cir?
Yes. A complete demolition permit, RES-DEM-25-000515, was filed October 1, 2025. The description says shared fences were excluded.
When was the duplex at 5623 Mesa Cir permitted?
The new-construction and plumbing permits were filed October 28, 2025. An electrical permit followed on January 16, 2026.
What construction work is permitted at 5623 Mesa Cir?
Records include permits for demolition, a new duplex, plumbing, electrical work, a new HVAC system with ductwork, and a fence. The HVAC permit was filed March 1, 2026, and the fence permit was filed March 24, 2026.
Is 5623 Mesa Cir a single-family home or a duplex?
The new-construction permit description identifies the project as a duplex at 5623 and 5625 Mesa Cir.
Has construction been completed at 5623 Mesa Cir?
The records provided show permits filed through March 24, 2026, but do not state whether construction is complete.
Also being built nearby
All of 75235- 5628 Mesa CirMar 11, 2026The fence height is 6'8 at the highest height for about 12 ft. wide one one side the below will not allow me to put height and inches so i rounded up to 7ft · 15 m away
- 5634 Mesa CirNov 9, 2025Install new vac system with duct work · 21 m away
- 5601 Mesa CirOct 21, 2025Remove drive approach and replace with wider drive approach for 5601 mesa cir that is now a duplex 5601-5603 mesa cir · 31 m away
- 5704 Wayside DrFeb 16, 2026Install new hvac system with ductwork · 64 m away
- 5603 Pick Fair CirAug 4, 2026Duct systemventhooddryerexhaust fans · 112 m away
- 5537 Mesa CirOct 21, 2025Drive approach for duplex located at 5537 mesa cir now 5537-5539 mesa cir dallas, texas 75235 · 113 m away
- 5702 Mesa CirSep 11, 2025Complete demolition excluding shared fences. hauling off debris and cleaning the lot blade clean · 117 m away
- 1535 Briar Cliff RdDec 1, 2025Gas leak repair under the house gas test · 134 m away
- 5516 Mesa CirAug 6, 2025Running the gas main yard line from the gas tap to the house about 35'-40 · 136 m away
- 5519 Mesa CirNov 10, 20265519 \| 5521 mesa circle · 136 m away
- 5705 Pick Fair CirJul 23, 2025Performing gas test from meter located behind backyard fence. the city put a lock on the meter and someone took it off and so far there is no leaks but have to pull a permit to get the gas system inspected · 136 m away
- 5707 Pick Fair CirSep 14, 2020Remodel existing plumbing · 138 m away