groundranger
Recent · latest filing Jul 2025Commercial

5705 Pick Fair Cir

Dallas, TX 75235

Gas system inspection permitted at 5705 Pick Fair Cir

A Dallas permit filed July 23, 2025, covers a gas-system test and inspection at 5705 Pick Fair Cir. Earlier permits filed in December 2020 and January 2021 covered an electrical service release, HVAC alteration and plumbing remodel; the records do not identify a new building.

Summarized from City of Dallas records · updated Jul 23, 2025

Projects
4
4 filings
Latest filing
Jul 23, 2025
since Dec 16, 2020
Largest scope
—
Listed value
$129
partial · often understated

Permit & project history

4 projects
  1. Performing gas test from meter located behind backyard fence. the city put a lock on the meter and someone took it off and so far there is no leaks but have to pull a permit to get the gas system inspected

    Performing gas test from meter located behind backyard fence. the city put a lock on the meter and someone took it off and so far there is no leaks but have to pull a permit to get the gas system inspected

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-002820
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Remodel existing plumbing

    Remodel existing plumbing

    City of Dallas permitPlumbing (PL) Single Family Alteration$125
    Record
    2101043103
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replace or modify existing hvac

    Replace or modify existing hvac

    City of Dallas permitMechanical (ME) Single Family Alteration$4
    Record
    2012173072
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Service release no work

    Service release no work

    City of Dallas permitElectrical (EL) Single Family Alteration
    Record
    2012163074
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 5705 Pick Fair Cir

What is happening at 5705 Pick Fair Cir?

A July 23, 2025, Dallas permit covers a gas-system test and inspection. The filing says the meter had been locked and the permit was needed to inspect the system.

Is a new building being built at 5705 Pick Fair Cir?

The available Dallas records do not identify new construction. They describe gas, plumbing, HVAC and electrical work.

When was the latest permit filed for 5705 Pick Fair Cir?

The latest record was filed July 23, 2025, under permit RES-PLM-25-002820. It covers a gas-system test and inspection.

What earlier work was permitted at 5705 Pick Fair Cir?

A plumbing remodel was filed January 4, 2021, and an HVAC alteration was filed December 17, 2020. An electrical service release with no work was filed December 16, 2020.

Is a business or tenant opening at 5705 Pick Fair Cir?

The permit records do not name a business or tenant. The latest filing describes gas-system testing and inspection.

Also being built nearby

All of 75235
Get alerts for 5705 Pick Fair Cir