Active · latest filing Aug 2026Commercial

6500 Cedar Springs Rd

Dallas, TX 75235

Permit filed for private-fleet EV charging equipment

A permit describes installation of private-fleet electric vehicle charging equipment at 6500 Cedar Springs Road. The City of Dallas permit was filed on August 27, 2026, and lists three preassembled supercharger units with 24 charging posts.

Summarized from City of Dallas records · updated Aug 27, 2026

Projects
3
3 filings
Latest filing
Aug 27, 2026
since Aug 27, 2026
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Bu zo el private fleet electric vehicle charging. the project includes the installation of (3) pre-assembled supercharger units, which include (3) cabinets, (24) charging posts, (6) pole mounted luminaries, (1) site controller, (1) primary broadcast unit, (2) wireless access points, (1) utility transformer, (1) meter and associated electrical equipment

    Bu zo el private fleet electric vehicle charging. the project includes the installation of (3) pre-assembled supercharger units, which include (3) cabinets, (24) charging posts, (6) pole mounted luminaries, (1) site controller, (1) primary broadcast unit, (2) wireless access points, (1) utility transformer, (1) meter and associated electrical equipment

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001642
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install a pre-engineered fire suppression system in a limited finishing station (garmat spot box max

    Install a pre-engineered fire suppression system in a limited finishing station (garmat spot box max

    City of Dallas permitFire Sprinkler (Major Work) (FI) Commercial Alteration$5K
    Record
    2007141080
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Remodel

    Remodel

    City of Dallas permitBuilding (BU) Commercial Renovation
    Record
    1909111129
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 6500 Cedar Springs Rd

What is being built at 6500 Cedar Springs Road?

A City of Dallas permit describes a private-fleet electric vehicle charging installation, including three preassembled supercharger units and related electrical equipment.

How many charging posts are planned at 6500 Cedar Springs Road?

The permit lists 24 charging posts across three preassembled supercharger units.

When was the EV charging project at 6500 Cedar Springs Road permitted?

The City of Dallas permit, COM-ALT-ADD-26-001642, was filed on August 27, 2026.

Will the chargers at 6500 Cedar Springs Road be open to the public?

The permit describes the equipment as private-fleet EV charging. It does not specify whether the chargers will be open to the public.

What is being built near Highland Park United Methodist Church Campus Updates?

A permit for 6500 Cedar Springs Road describes a private-fleet EV charging installation. The listed Highland Park United Methodist Church Campus Updates location is about 466 meters away.

Also being built nearby

All of 75235

More cell towers & telecom in 75235.

Get alerts for 6500 Cedar Springs Rd