3130 W Mockingbird Ln
Dallas, TX 75235
3130 W Mockingbird Ln: 7 projects on record
City of Dallas lists 7 filings across 7 projects at 3130 W Mockingbird Ln, Dallas, TX 75235 since September 17, 2020. The most recent, filed October 6, 2020, covers: “Electrical repairs”.
Compiled from City of Dallas records · updated Oct 6, 2020
- Projects
- 7
- 7 filings
- Latest filing
- Oct 6, 2020
- since Sep 17, 2020
- Largest scope
- —
- Listed value
- $6
- partial · often understated
Permit & project history
7 projectsSources: City of Dallas
Questions about 3130 W Mockingbird Ln
What is being built at 3130 W Mockingbird Ln?
The latest filing (City of Dallas permit 2010062010, October 6, 2020) covers electrical repairs.
How many permits and filings does 3130 W Mockingbird Ln have?
7 filings across 7 projects, from September 17, 2020 to October 6, 2020.
How much is the construction at 3130 W Mockingbird Ln worth?
Permits at this address list about $6 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Chick-Fil-A in Dallas?
3130 W Mockingbird Ln is about 161 m from Chick-Fil-A (3040 W Mockingbird Lane). Its latest filing is for electrical repairs.
Is there other construction near 3130 W Mockingbird Ln?
Yes. Nearby filings include 3230 W Mockingbird Ln (in house - quiktrip 936 - coffee wow phase 2.5 - updated millwork and equipment to existing coffee bar, install new drain manifold to serve the coffee bar, added dedicated waterline and circuit for coffeewow autoclean system, add glycol chiller and nitrogen generator for nitro coffee, Aug 13, 2024); 6519 Cedar Springs Rd (erect attached sign, Jan 4, 2021); 6500 Cedar Springs Rd (bu zo el private fleet electric vehicle charging. the project includes the installation of (3) pre-assembled supercharger units, which include (3) cabinets, (24) charging posts, (6) pole mounted luminaries, (1) site controller, (1) primary broadcast unit, (2) wireless access points, (1) utility transformer, (1) meter and associated electrical equipment, Aug 27, 2026).
How do I get alerts for new permits at 3130 W Mockingbird Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75235- 3230 W Mockingbird LnAug 13, 2024In house - quiktrip 936 - coffee wow phase 2.5 - updated millwork and equipment to existing coffee bar, install new drain manifold to serve the coffee bar, added dedicated waterline and circuit for coffeewow autoclean system, add glycol chiller and nitrogen generator for nitro coffee · 86 m away
- 6519 Cedar Springs RdJan 4, 2021Erect attached sign · 140 m away
- 6500 Cedar Springs RdAug 27, 2026Bu zo el private fleet electric vehicle charging. the project includes the installation of (3) pre-assembled supercharger units, which include (3) cabinets, (24) charging posts, (6) pole mounted luminaries, (1) site controller, (1) primary broadcast unit, (2) wireless access points, (1) utility transformer, (1) meter and associated electrical equipment · 149 m away
- 3040 W Mockingbird LnSep 14, 2026Bu zo installing new illuminated awnings for cfa · 161 m away
- 3040 W Mockingbird Lane · Chick-Fil-AJan 27, 2025Tenant improvement chick-fil_a #03904 love field — renovation/alteration — extend length of 2nd drive-thru lane; add ordering canopy; replace delivery canopy; remove (e) patio & canopy; add new patio and canopy; add trash enclosure; add tormax door & 2 team member doors; interior remodeling; civil under separate submittal · 161 m away
- 6445 Cedar Springs RdApr 13, 2026This is an inspection request to release oncor to turn meter back on, no work is being done · 209 m away
- 3305 Manor WaySep 21, 2020Electrical repairs · 317 m away
- 6618 Collville AveJun 2, 2026This submittal details the replacement of an existing chain-link fence with an eight-foot precast ledgestone screen wall topped with three strands of barbed wire at an existing oncor substation (parcel ids: 00000222739000000; 00000222754000000; 00000222742000000; 00000222745000000; 00000222748000000; 00000222751000000; 00000222757000000; 00000222760000000; 00000222763000000). the structure is supported by 18-inch diameter, 10-foot-deep piers with centrally embedded astm a992 grade 50 steel posts and wall panels maintaining a three (3) to six (6)-inch bottom clearance. engineered for 135 to 140 mph winds per city of dallas and asce 7-16 requirements, the design complies with aci 318-08 and the pci design manual sixth edition. materials include 5,000 psi concrete for panels and caps (4,000 psi stripping), 8,000 psi non-shrink grout, astm a615 grade 60 rebar and 60 ksi smooth welded wire mesh. hardware features 12-inch flared loop coil inserts with a 7,500-pound pull strength · 321 m away
- 6300 Cedar Springs RdApr 8, 2026Replace section of 4" sewer line · 329 m away
- 6303 Cedar Springs RdNov 16, 2026Primary and paint booth wiring · 330 m away
- 3387 Hawes AveApr 20, 2026We are building a 20x40 freestanding covered carport · 331 m away
- 3202 Manor WayNov 14, 2025Someone tried to break into box - only cover was missing - no work needed to be done · 339 m away
More restaurants in 75235.